My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEASUREMENT AND PAYMENT <br /> No measurement will be made. Full compensation for conforming to these requirements, <br /> including all the labor, materials, tools, equipment, incidentals and for doing all the work <br /> involved in this section necessary for completion of the work, as shown on the Contract Plans, <br /> as specified in the Standard Specifications, these special provisions and as directed by the <br /> Engineer, shall be considered as included in the prices paid for the various contract items of <br /> work involved and no additional compensation will be allowed. <br /> SECTION 01050 — CONSTRUCTION STAKING <br /> A. General <br /> This section specifies construction staking. All construction staking shall be done in accordance <br /> with Section 2.14 of the City of Tracy Standard Specifications, as shown on the plans, described <br /> in these Special Provisions, and directed by the Engineer. <br /> B. Layout <br /> The Contractor shall use horizontal and vertical controls to lay out the work whether or not shown <br /> on the Drawings from existing City benchmarks. The Contractor shall retain the services of a <br /> California licensed surveyor to perform all survey control, staking, layout, and verification work. <br /> Survey stakes and marks will be set by a California Licensed Surveyor or a California Registered <br /> Civil Engineer to establish the lines and grades required for the completion of the work specified in <br /> these specifications and on the plans. The Contractor shall be responsible for providing such <br /> stakes and marks a reasonable length of time in advance of starting operations that require such <br /> stakes and marks. <br /> Stakes and marks set by the Contractor's Surveyor or Engineer shall be carefully preserved by <br /> the Contractor. In case such stakes and marks are destroyed or damaged they will be replaced <br /> as soon as possible by the Surveyor. The Contractor will be responsible for the cost to replace <br /> and restore the stakes and marks. <br /> C. Accuracy <br /> The Contractor shall be fully responsible for the accuracy of the construction staking. The <br /> construction stakes and marks shall be furnished and set with accuracy to assure that the <br /> completed work conforms to the lines, grades, and section shown on the plans. It shall be the <br /> Contractor's responsibility to notify the Engineer of any discrepancies found between field <br /> conditions and grades and notes shown on the plans. <br /> D. Records <br /> All computations necessary to establish the exact position of the work from control points shall be <br /> performed by the Contractor. All computation, survey notes, and other records necessary to <br /> accomplish the work shall be neat, legible and accurate. Such computations, notes and other <br /> records shall be made available to the Engineer upon request and shall become the property of <br /> the City and delivered to the Engineer before acceptance of the project. <br /> July 2007 Division III-18 NEI Phase II Water and Sewer <br /> CIP Nos, 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.