My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Contractor shall certify on each submittal document that he has reviewed the submittal, <br /> verified field conditions, and complied with the Contract Documents. <br /> C. Transmittal Procedure <br /> Unless otherwise specified, submittals regarding material and equipment shall be accompanied <br /> by a transmittal form. A separate form shall be used for each specific item, class of material, <br /> equipment, and items specified in separate, discrete sections, for which the submittal is <br /> required. Submittal documents common to more than one piece of equipment shall be identified _ <br /> with all the appropriate equipment numbers. Submittals for various items shall be made with a <br /> single form when the items taken together constitute a manufacturer's package or are so <br /> functionally related that expediency indicates checking or review of the group or package as a <br /> whole. <br /> If the Contractor proposes to provide material, equipment, or method of work which deviates <br /> from the project requirements, he shall indicate so under "deviations" on the transmittal form <br /> accompanying the submittal copies. <br /> Submittals which do not have all the information required to be submitted, including deviations, <br /> are not acceptable and will be returned without review. <br /> D. Review Procedure <br /> Review shall not extend to means, methods, techniques, sequences or procedures of <br /> construction, or to verifying quantities, dimensions, weights or gages, or fabrication processes <br /> (except where specifically indicated or required by the project) or to safety precautions or <br /> programs incident thereto. Review of a separate item, as such, will not indicate approval of the <br /> assembly in which the item functions. _ <br /> Unless otherwise specified, within 21 calendar days after receipt of a submittal for review and <br /> comment, the Engineer shall review the submittal and return 3 copies of the marked-up original. <br /> E. Effect of Review of Contractor's Submittals <br /> Review of contract Drawings, methods of work, or information regarding materials or equipment <br /> the Contractor proposes to provide, shall not relieve the Contractor of his responsibility for <br /> errors therein and shall not be regarded as an assumption of risks or liability by the Engineer or <br /> the City, or by any officer or employee thereof, and the Contractor shall have no claim under the <br /> Contract on account of the failure, or partial failure, of the method of work, material, or <br /> equipment so reviewed. <br /> The Work covered by a submittal may be commenced only after the Engineer has reviewed the — <br /> pertinent submittals and returned copies to the Contractor marked either "NO EXCEPTIONS <br /> TAKEN" or "MAKE CORRECTIONS NOTED." Corrections indicated on submittals shall be <br /> considered as changes necessary to meet the requirements of the Contract Documents. Review <br /> of submittals by the Engineer shall not be construed as relieving the Contractor of his/her <br /> responsibilities under this Contract. <br /> Division III-23 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos. 7468,7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.