My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Documentation Plans <br /> The Contractor shall develop and implement a record keeping system Lo dol ul i lel It compliance <br /> tpllal lVG <br /> with the requirements of this section. <br /> Equipment and system documentation as a minimum shall include date of test, equipment <br /> number or system name, nature of test (performance or operational), test objectives, test <br /> results, test instruments used for the test and signature spaces for the Engineer's witness and <br /> the Contractor. <br /> C. Test Plans <br /> The Contractor shall develop test plans in cooperation with the equipment suppliers detailing the <br /> coordinated, sequential testing of each item of equipment and system provided under this <br /> contract. Each test plan shall be specific to the item of equipment or system to be tested. Test <br /> plans shall identify by specific equipment or tag number each device or control station to be <br /> manipulated or observed during the test procedure and the specific results to be observed or <br /> obtained. Test plans shall also be specific as to support systems required to complete the test <br /> work, temporary systems required during the test work, subcontractors' and manufacturers' <br /> representatives to be present and expected test duration. <br /> D. Testing Schedule <br /> The Contractor shall produce a testing schedule setting forth the sequence contemplated for <br /> performing the test work. The schedule shall show the contemplated start date, duration of the <br /> test and completion of each test. The test schedule shall be submitted no later than 2 weeks in <br /> advance of the date testing is to begin. <br /> Standby power equipment and automatic transfer switches shall be operated and tested at the <br /> same time as an integral system. <br /> E. Product Data <br /> The original and three copies of all records produced during the testing program shall be <br /> provided as product data in accordance with Section 01300. <br /> The objective of the testing program shall be to demonstrate, to the City and the Engineer's <br /> complete satisfaction, that the systems and equipment provided under this Contract meet all <br /> performance requirements. <br /> F. Performance Tests <br /> 1. Each item of mechanical, electrical, and instrumentation equipment installed <br /> under this Contract shall be tested to demonstrate compliance with the <br /> performance requirements of this project. Each electrical, instrumentation, and <br /> mechanical system installed or modified under this Contract shall be tested in <br /> accordance with the requirements of the Contract Documents. <br /> 2. In general, performance tests for any individual system shall be performed in the <br /> order listed herein. The order may be altered as authorized by the Engineer in <br /> writing after receipt of a written request, complete with justification of the need for <br /> the change in sequence. <br /> July 2007 Division III-34 NEI Phase Ii Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.