My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. The Contractor shall submit the test plan(s) required for the systematic field <br /> performance tests for the equipment and/or components installed under this <br /> Contract. Once the Engineer has reviewed and taken no exception to the — <br /> Contractor's test plan(s), the Contractor shall reproduce the plan(s) in sufficient <br /> number for the Contractor's purposes and an additional 3 copies for delivery to <br /> the Engineer. No test work for the equipment, system or facility shall begin until <br /> the Contractor has delivered the specified number of approved final test plans to <br /> the Engineer. <br /> G. Pre-Operational Checkout <br /> 1. Alignment of equipment <br /> 2. Proper electrical voltage, phase, and equipment rotation <br /> 3. Pre-operation lubrication <br /> 4. Manufacturer's recommendations for pre-start preparation <br /> H. Functional Tests <br /> 1. Once all affected equipment has been subjected to the required pre-operational <br /> check-out procedures and the Engineer has witnessed and has not found <br /> deficiencies in that portion of the work, individual items of equipment and -- <br /> systems may be started and operated under simulated operating conditions for a <br /> minimum of 4 hours to determine as nearly as possible whether the equipment <br /> and systems meet the requirements of these specifications. The equipment shall <br /> be operated a sufficient period of time to determine machine operating <br /> characteristics, including noise, temperatures and vibration; to observe and <br /> document performance characteristics; and to permit initial adjustment of <br /> operating controls. During the functional test period, the Contractor shall obtain <br /> baseline operating data on all equipment with motors greater than '/4 hp to <br /> include amperage, bearing temperatures, and vibration as required. This <br /> baseline data will be collected for the City to enter in their preventive <br /> maintenance system. <br /> 2. Test results shall be within the tolerances set forth in the detailed specification _ <br /> sections of the Contract Documents. If no tolerances have been specified, test <br /> results shall conform to tolerances established by recognized industry practice. <br /> Division III-35 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.