C. Provide for continuous system operation, including nights, weekends, and <br /> holidays. Provide standby pumping equipment. <br /> D. Monitor operations to verify that the system lowers groundwater levels at a rate <br /> required to maintain a dry excavation resulting in a stable subgrade for <br /> prosecution of subsequent operations. — <br /> E. Treat groundwater in appropriate tanks onsite to remove any settleable solids <br /> and allow periodic testing by the Contractor as required by applicable <br /> regulations. Hold groundwater until testing by the Contractor indicates that it is <br /> not contaminated, and is suitable for discharge to the storm drainage system. <br /> F. Do not allow groundwater or drainage water levels to rise until backfilling <br /> operations have been completed. <br /> G. Remove all groundwater control systems upon completion of construction or — <br /> when dewatering and control of surface or groundwater is no longer required. <br /> H. Replace any excavation performed for convenience of dewatering in foundation _ <br /> beds with materials as impermeable as original foundation material. Compact <br /> backfill to not less than 95 percent of the maximum dry density in accordance <br /> with Section 02200, or as indicated on the Drawings. _ <br /> 3.02 SURFACE AND EXCAVATION DRAINAGE WATER CONTROL <br /> A. Intercept surface water and divert it away from excavations through use of dikes, — <br /> ditches, curb walls, pipes, sumps or other approved means. The requirement <br /> includes temporary works required to protect adjoining properties from surface — <br /> drainage caused by construction operations. <br /> B. Divert surface, excavation, and seepage water into sumps and pump it into <br /> drainage channels or storm drains, as approved by agencies having jurisdiction. _ <br /> Provide settling basins and other treatment for water quality control. <br /> SECTION 02160 — SITE PREPARATION <br /> PART 1 — GENERAL — <br /> 1.01 SCOPE <br /> This section specifies site preparation, which consists of clearing, grubbing, topsoil stockpiling <br /> and disposal of materials. <br /> 1.02 JOB CONDITIONS <br /> A. Existing Conditions <br /> The Contractor shall determine the actual condition of the site as it affects this portion of work. — <br /> Division III-53 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos.7468, 7589,7590 <br />