My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.04 SUBMITTALS <br /> In accordance with Section 01300, submittals shall include test results, certifications, and <br /> source for all earthwork materials. <br /> 1.05 MEASUREMENT AND PAYMENT <br /> No measurement will be made. Full compensation for conforming to these requirements, <br /> including all the labor, materials, tools, equipment, incidentals and for doing all the work <br /> involved in this section necessary for completion of the work, as shown on the Contract Plans, <br /> as specified in the Standard Specifications, these special provisions and as directed by the <br /> Engineer, shall be considered as included in the prices paid for the various contract items of <br /> work involved and no additional compensation will be allowed. <br /> PART 2 — PRODUCTS <br /> 2.01 MATERIALS <br /> A. Engineered Fill <br /> Unless otherwise indicated or specified, engineered fill shall be used for all fill work. Engineered <br /> fill material shall consist of soil excavated onsite, or hauled to the site from offsite sources, free <br /> of debris, wood, trash, peat, and other objectionable material which may be compressible or <br /> which cannot be compacted properly. Engineered fill shall be well graded and shall possess <br /> sufficient fines such that no nesting or voids result in the compacted mass. Import engineered fill <br /> material with low to non-expansive soil meeting the following requirements: <br /> Sieve Size Percent Passing by <br /> Weight <br /> 3 inches 100 <br /> 1 inch 95 <br /> #200 15-50 <br /> Plasticity (P.1.) = 15 or less <br /> Liquid Limit (L.L.) = 30 or less <br /> B. Crushed Rock (Drain Rock) <br /> Crushed rock shall be clear and free draining and conform to the following gradation: <br /> Percentage Passing <br /> Sieve Size By Weight <br /> 3/4 inch 90-100 <br /> 1/2 Inch 30-60 <br /> 3/8 inch 0-20 <br /> No. 4 0-5 <br /> July 2007 Division III-56 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.