My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.03 FINISHING AND CURING <br /> A. The finish surface shall be smooth and to the grade indicated or directed by the - <br /> Engineer. Surfaces shall be free from fins, bulges, ridges, offsets, and <br /> honeycombing. Finishing by wood float, steel trowel, or similar methods is not <br /> required. <br /> B. CLSM shall be kept damp for a minimum of 7 days or until final backfill is placed. <br /> 3.04 PROTECTION <br /> A. CLSM shall be protected from freezing for 72 hours after placement. <br /> B. No equipment, traffic or backfill shall be allowed on the CLSM until the surface of <br /> the CLSM is able to withstand a 20 psi load without displacement or damage in <br /> accordance with ASTM D6024. If necessary, the Contractor shall provide steel - <br /> trench plates that span the trench, as specified in Section 02210, Earthwork, until <br /> the CLSM has reached the required strength. <br /> C. CLSM shall be protected from running water, rain, and other damage until the <br /> material has been accepted and final fill completed. <br /> SECTION 02221 -TRENCHING, BACKFILLING AND COMPACTING <br /> PART 1 - GENERAL - <br /> 1.01 SUMMARY <br /> This Section specifies requirements for trenching, backfilling, and compacting of trenches for -- <br /> pipeline construction. <br /> 1.02 SUBMITTALS <br /> Submittals shall be provided in accordance with Section 01300. <br /> 1.03 MEASUREMENT AND PAYMENT <br /> No measurement will be made. Full compensation for conforming to these requirements, <br /> including all the labor, materials, tools, equipment, incidentals and for doing all the work <br /> involved in this section necessary for completion of the work, as shown on the Contract Plans, <br /> as specified in the Standard Specifications, these special provisions and as directed by the <br /> Engineer, shall be considered as included in the prices paid for the various contract items of <br /> work involved and no additional compensation will be allowed. <br /> PART 2 - MATERIALS <br /> 2.01 BEDDING <br /> A. Unless otherwise indicated, all bedding shall meet the requirements of Section <br /> 02200. <br /> Division III-65 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos.7468,7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.