My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Controlled Low Strength Material fill used for pipe bedding shall comply with the <br /> requirernents as specified in Section 02210. <br /> 2.02 BACKFILL <br /> A. Trench backfill shall comply with Section 02200 and the applicable section for the <br /> type of facility being installed. <br /> PART 3 - EXECUTION <br /> 3.01 TRENCHING <br /> A. Trench excavation shall be unclassified. <br /> B. The terms "earthwork" or"excavation" include all materials excavated or removed <br /> regardless of material characteristics. <br /> C. Make an estimate of the kind and extent of materials that will be encountered in <br /> the excavation. <br /> D. Provide free access to all fire hydrants, water valves, and meters. Leave <br /> clearance to enable the free flow of storm water in all gutters, conduits and <br /> natural watercourses. <br /> E. Remove all ledge rock, boulders and stones 4 inches and larger to provide a <br /> minimum clearance of 12 inches under and around the pipe as shown on <br /> Drawings. <br /> F. Replace all excavated material with engineered fill material that meets the <br /> requirements of Section 02200. <br /> G. In loose or soft soils, perform the excavation at the bottom of the trench by <br /> equipment that does not have digging teeth. Should the natural or fill foundation <br /> soils at the trench bottom be disturbed or loosened because of the Contractor's <br /> operations, re-compact or remove. If material is removed, refill the area with <br /> material as specified in Section 02200. <br /> 3.02 TRENCHING FOR PIPELINES <br /> A. Excavate all trenches in accordance with the lines and grades shown on the <br /> Drawings. Typical trench sections with maximum and minimum dimensions are <br /> shown on Drawings. <br /> 3.03 PIPE FOUNDATIONS <br /> A. Inadequate Soils: <br /> 1. Where the undisturbed condition of the natural soil material is inadequate <br /> for support of the planned pipeline, the Engineer will direct the Contractor <br /> to over-excavate to adequate supporting soils. <br /> July 2007 Division III-66 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.