My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Fill the excavated space to the specified grade with structural backfill per <br /> Section 02200. <br /> 3. All costs involved in the excavation and disposal of the inadequate soil <br /> material and placement of the fill shall be considered over-excavation. <br /> 4. Should the excavation be carried below the lines and grades indicated on <br /> the Drawings because of the Contractor's operations, refill such <br /> excavated space to the proper elevation. <br /> B. Foundation Preparation: <br /> 1 Properly prepare the foundation and place the foundation material prior to <br /> installation of all pipe bedding and pipe. <br /> 2. This shall include the necessary preparation of the native trench bottom <br /> and/or the top of the foundation material to a uniform grade so that the <br /> entire length of pipe rests firmly on a suitable properly compacted <br /> material. <br /> 3. Place bedding and backfill material around the pipe in a manner to meet <br /> requirements specified in the respective section for the type of pipe being _ <br /> installed. <br /> 3.04 PIPE BEDDING <br /> A. Placement of bedding material and fabric wrap in the pipe zone shall be as <br /> indicated on the Drawings or as specified in the section regarding the type of <br /> pipe being constructed. <br /> 3.05 BACKFILLING <br /> A. Complete pipe bedding and initial backfill as shown on the Drawings before <br /> subsequent backfilling operations are started. <br /> B. Take all necessary precautions to protect the pipe from any damage, movement <br /> or shifting. In general, perform backfilling by placing the material so as not to <br /> damage the pipe. <br /> C. Provide for the proper maintenance of traffic flow and accessibility as may be <br /> necessary, and make adequate provisions for the safety of property and persons. <br /> D. Unless specifically authorized in writing by the Engineer, remove temporary <br /> cribbing, sheeting or other timbering. <br /> E. Remove all brush, stumps, logs, planking, disconnected drains, boulders, etc. <br /> from the material to be used for backfilling the trench. <br /> Division III-67 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos.7468,7589,7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.