My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.03 MANHOLES <br /> Manholes shall be constructed as shown on the Drawings. <br /> SECTION 02800 — CLOSED-CIRCUIT TELEVISION PIPELINE INSPECTION <br /> PART 1 — GENERAL <br /> 1.01 SUMMARY <br /> A. Closed Circuit Television (CCTV) inspection is required at the following phases of <br /> the work to: <br /> 1. Pre and Post construction Inspection of existing irrigation pipeline as <br /> indicated on the Drawings. <br /> 2. Post construction inspection of all sewer pipelines installed as part of the <br /> project. <br /> B. This section is intended to provide the Contractor with general guidelines. It is the <br /> Contractor's responsibility to supply all labor, materials, equipment and <br /> apparatus not specifically mentioned herein or noted on the Plans, but which are <br /> incidental and necessary to complete the specified work. <br /> 1.02 SUBMITTALS <br /> A. The Contractor shall provide the following submittals as specified in <br /> Section 01300: <br /> 1. The Contractor shall provide to the Engineer video recording and suitable <br /> log for each pipeline inspection. All video inspection shall utilize VHS- <br /> fiormat videotapes or DVD for documentation. Unedited video recordings <br /> and a suitable log of the inspection shall be provided to the Engineer five <br /> working days prior to sewer pipeline construction (Inspection of existing <br /> irrigation pipeline) and within three working days after the sewer is <br /> installed and backfilled (for both irrigation pipeline and all installed <br /> sewers). If post-installation inspection recordings are not submitted within <br /> three working days of the pipeline installation, the Engineer, may at their <br /> discretion, suspend any further installation of pipe until the post- <br /> installation recordings are submitted. As a result of this suspension, no <br /> additional working days will be added to the contract, nor will any <br /> adjustment be made for increase in cost. <br /> 2. Pre-installation inspection log: Submitted with each pre-installation video <br /> recording. The log shall identify the irrigation line by street location and <br /> distance from upstream end. The log shall include: <br /> a. Location and alignment length. <br /> b. Documentation and detailed description of defects, unusual <br /> conditions, presence of scale and corrosion prior to installing the <br /> adjacent sewer. <br /> 3. Post-installation inspection log: Submitted with each post-installation <br /> video recording. The log shall: <br /> July 2007 Division III-78 <br /> NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.