My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. Unless otherwise specified, all public and private property impacted by the <br /> construction shall be restored as indicated in this Section or on the Drawings. <br /> D. Restrict operations to cause the least amount of damage to the surrounding <br /> property. _ <br /> E. The Contractor shall be held responsible <br /> of thenworkma damage repair to lsolr geplacestructures, <br /> any <br /> work materials, or equipment because <br /> damaged structures, work, materials or equipment to the satisfaction of the <br /> property owner. <br /> F. Ensure that construction related activities do not damage off-site features or _ <br /> adjacent vegetation. The Engineer shall be notified immediately if accidental <br /> damage occurs. Contractor shall ensure that adjacent roads are maintained and <br /> clear of soil and/or other debris at all times during construction. Any changes or <br /> modifications to this plan shall receive prior approval from the Engineer. - <br /> 1.02 SUBMITTALS <br /> A. Procedures: Section 01300. <br /> 1.03 SITE CONDITIONS <br /> A. Execute all work in an orderly and careful manner with due consideration for <br /> surrounding areas, plantings, or structures which are to remain. <br /> 1. Protect adjacent property and improvements from work damage. <br /> 2. Repair any damage until acceptable to Engineer. <br /> B. Protect improvements from damage, soiling or discoloration. <br /> C. Examine finish grades, verify elevations, observe conditions under which work is <br /> to be performed and notify Engineer of unsatisfactory conditions. <br /> D. Utilities: Determine location of utilities and perform work in manner which will <br /> avoid possible damage; hand excavate as required. <br /> 1.04 MEASUREMENT AND PAYMENT <br /> No measurement will be made. Full compensation for conforming to these requirements, <br /> including all the labor, materials, tools, equipment, incidentals and for doing all the work <br /> involved in this section necessary for completion of the work, as shown on the Contract Plans, <br /> as specified in the Standard Specifications, these special provisions and as directed by the _ <br /> Engineer, shall be considered as included in the prices paid for the various contract items of <br /> work involved and no additional compensation will be allowed. <br /> PART 2 - PRODUCTS <br /> 2.01 MATERIALS - <br /> Division III-81 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.