Submersible wastewater pumps shall be installed in an existing concrete wetwell. A separate <br /> existing concrete vault shall be provided for the plug valves and check valves as indicated on <br /> the Drawings. <br /> 1.02 QUALITY ASSURANCE <br /> A. Factory Tests <br /> Each pump shall be tested for performance at the factory to determine head vs. <br /> capacity, efficiencies, and kilowatt draw for the specified operating points. All tests shall <br /> be run in accordance with the American Hydraulic Institute Standards, and shall include <br /> the following additional tests. <br /> 1. Impeller, motor rating, and electrical connections shall be checked for <br /> compliance with the specifications. <br /> 2. The motor and cable insulation shall be tested for defects and moisture <br /> content. <br /> 3. Prior to the operational test, the pump shall be run dry to establish correct <br /> rotation and mechanical integrity. <br /> 4. Operational test: The pump shall be run for 30 minutes while submerged <br /> a minimum of 6' underwater. <br /> 5. After the operational test, the insulation shall be tested again as — <br /> described above. <br /> 1.03 SUBMITTALS -- <br /> Submittals required under this Section shall be in accordance with Section 01300. <br /> A. Shop Drawings: Submit shop drawings for approval of the pumps and related <br /> equipment specified in this Section. <br /> 1. Certified shop and installation drawings and data regarding pump and -- <br /> motor characteristics and performance. The data shall include performance <br /> curves, based on the shop tests described above, for head, capacity, <br /> efficiency, and horsepower. Indicate separately the minimum submergence — <br /> required at the guarantee point. <br /> 2. Make, model, weight, and horsepower of each equipment assembly. <br /> 3. Complete motor nameplate data, as defined by NEMA, motor <br /> manufacturer, and including any motor modifications. <br /> 4. Complete catalog information, descriptive literature, specifications, and — <br /> identification of materials of construction. <br /> 5. Detailed mechanical and electrical drawings showing the equipment <br /> dimensions, size, and locations of connections and weights of associated _- <br /> equipment. <br /> 6. Power and control wiring diagrams, including terminals and numbers. <br /> July 2007 Division III-123 NEI Phase II Water and Sewer — <br /> CIP Nos. 7468,7589, 7590 <br />