My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. Shop painting system. <br /> C. Manuals: Furnish manufacturer's installation, lubrication, operation and <br /> maintenance manuals, bulletins, and parts lists. Operation and maintenance <br /> manuals shall be provided according to Section 15. <br /> D. Quality Control Submittals: <br /> 1. Factory Functional Test Report. <br /> 2. Special shipping, storage and protection, and handling instructions. <br /> 3. Manufacturer's printed installation instructions. <br /> 4. Field Test Procedures. <br /> 5. Manufacturer's Certificate of Proper Installation. <br /> 6. Suggested spare parts list to maintain the equipment in service for a period <br /> of one year. Include a list of special tools required for checking, testing, <br /> parts replacement, and maintenance with current price information. <br /> 7. Warranty for one year after equipment acceptance of the installation by the <br /> Engineer. <br /> 1.04 PERFORMANCE REQUIREMENTS <br /> Equipment Number P1 P2 P3 P4 P5 P6 <br /> Capacity (each), gpm 1,235 1,235 1,235 1,235 242 242 <br /> Total Dynamic Head, feet 34 34 34 34 16 16 <br /> Minimum Shutoff Head, feet 57 57 57 57 43 43 <br /> Pump Speed, rpm (norninal) 1,800 1,800 1,800 1,800 1,800 1,800 <br /> Horsepower, Hp 20 20 20 20 3 3 <br /> Voltage, volts/Phase 460/3 460/3 460/3 460/3 460/3 460/3 <br /> Minimum efficiency (at design 75% 75% 75% 75% 68% 68% <br /> condition) <br /> 1.05 MEASUREMENT AND PAYMENT <br /> No measurement will be made. Full compensation for conforming to these requirements, <br /> including all the labor, materials, tools, equipment, incidentals and for doing all the work <br /> involved in this section necessary for completion of the work, as shown on the Contract Plans, <br /> as specified in the Standard Specifications, these special provisions and as directed by the <br /> Engineer, shall be considered as included in the prices paid for the various contract items of <br /> work involved and no additional compensation will be allowed. <br /> July 2007 Division III-124 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.