My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Prelubricated Anti-friction bearings shall be protected in accordance with <br /> the bearing manufacturer's recommendations against the formation of <br /> rust during a period of storage while awaiting the completion of <br /> installation and startup. <br /> C. Mechanical Seals <br /> Each pump shall be provided with a mechanical seal. The seal shall consist of one <br /> stationary and one rotating tungsten-carbide or silicon-carbide ring, or one stationary <br /> tungsten-carbide or silicon-carbide ring and one driven rotation carbon ring. The seals <br /> shall not require regular maintenance or adjustment and shall be easily inspected and <br /> replaceable. <br /> D. Motors <br /> Pump motor shall be housed in a air filled, watertight casting of NEMA B design and <br /> shall have Class F insulated windings, which shall be moisture resistant. Pump motors <br /> shall be capable of continuous operation in a totally, partially, or nonsubmerged <br /> condition, including a minimum of 6 starts per hour. The pumps shall be capable of <br /> running dry in a totally dry condition without damage for 24 hours. The power cable shall <br /> be of adequate length to reach the furthest end of the motor control center plus ten feet. <br /> Provide motors with single cables of submersible pump application with p.122 MSHA <br /> approval. Motors shall be specifically designed for submersible operation and shall be <br /> explosion proof' rated. <br /> E. Thermal Protection <br /> Motors shall be equipped with three normally closed thermal switches embedded in the <br /> end coils of the stator winding (one per phase). These switches shall be set to open at <br /> 260°F. <br /> F. Guide Rails and Bases <br /> 1. Guide rails and bases shall be an integral part of the pumping unit and <br /> the pump casing shall have a machined flange to connect with the <br /> discharge connection. Discharge connection shall be bolted to the floor of <br /> the wetwell and so designed as to receive the pump connecting flange <br /> without the need of any bolts, gaskets, or nuts. The guide rails shall be <br /> Schedule 40 stainless steel, 2 inches in diameter. <br /> 2. Sealing of the pumping unit to the discharge connection shall be <br /> accomplished by a simple linear downward motion of the pump along the <br /> guide rails with the entire weight of the pumping unit pressing tightly <br /> against the discharge connection. No portion of the pump shall bear <br /> directly on the floor of the wetwell and no rotary motion of the pump shall <br /> be required for sealing. The maximum allowable leakage is 0.005 times <br /> the total flow at the design point. <br /> 3. Cable entry design shall preclude specific torque requirements. The cable <br /> entry shall have single grommet, washers, compressed by the entry body <br /> containing a strain relief function. The cable entry junction chamber and <br /> July 2007 Division III-126 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.