My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PART 3 - EXECUTION <br /> 3.01 INSTALLATION <br /> Equipment and accessories shall be installed in accordance with approved written procedures <br /> submitted with the shop drawings, and as indicated on the Drawings. <br /> 3.02 INSPECTION AND TESTING <br /> After installation but prior to acceptance of the pumping equipment, each unit shall be given a <br /> running test during which it shall demonstrate its ability to operate within vibration limits set forth <br /> in the Hydraulics Institute Standards, and without overheating and to meet the performance data <br /> listed herein. Tests shall include electrical, head and discharge measurements sufficient to <br /> duplicate the head discharge and efficiency curves submitted with the shop drawings. <br /> The Contractor shall furnish all labor, piping, equipment, pressure gauges and materials <br /> necessary for conducting the tests, including necessary clean water. <br /> 3.03 TRAINING AND INSTRUCTION <br /> A factory representative, who has complete knowledge of proper operation and maintenance of <br /> the equipment furnished shall be provided for four (4) hours to instruct representatives of the <br /> City on the proper operation and maintenance of the equipment. The instruction may be done at <br /> the same time as the inspection of the installation and test run, provided the test is successful, <br /> and the operating and maintenance instructions furnished have been approved by the Engineer. <br /> SECTION 11345 — SUBMERSIBLE SUMP PUMPS <br /> PART 1 — GENERAL <br /> 1.01 DESCRIPTION <br /> A. Scope <br /> This section specifies single simplex submersible sump pumps complete with motor, float <br /> controls, cable, and lifting handle. The pump shall be provided as specified and located in each <br /> vault sump and containment sump as shown on the Drawings. <br /> B. Type <br /> Pump shall be of the submersible, centrifugal nonclog type for use in pumping floor drainage. <br /> Sump Pumps located in the chlorine feed vault shall be corrosion-resistant design. <br /> C. Operating Requirements <br /> Equipment provided under this section shall conform to the following: <br /> L <br /> city, gpm 20 to 25 <br /> d, feet 25 <br /> peed, rpm 1,800 <br /> July 2007 Division III-128 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.