Laserfiche WebLink
1. Zinc Ribbon Anodes <br /> 2. Zinc Grounding Mats <br /> 3. Prepackaged Zinc Anodes <br /> 4. Cables <br /> 5. Cable Terminations & Splicing Materials <br /> 6. Exothermic Welding Equipment and Supplies _ <br /> 7. Ground Clamps <br /> 8. Cable-To-Pipe Coating Material <br /> 9. Traffic Boxes and Junction Boxes -- <br /> 10. Terminal Boxes, Shunts and Hardware <br /> 11. Cable Warning Tape <br /> 12. Cable Identification Tags <br /> 13. Insulating Flange Kits <br /> 14. Double boot assembly for flexible couplings <br /> 15. Safety Procedures <br /> 1.08 INTERFERENCE AND EXACT LOCATIONS <br /> A. The Contractor shall coordinate and properly relate this work to the site and to <br /> the work of all trades. The general locations of the facilities are shown on the _ <br /> drawings. However, the Contractor shall visit the premises and thoroughly <br /> familiarize himself with all details of the work and working conditions, verify <br /> existing conditions in the field, determine the exact locations of existing pipelines _ <br /> and structures and advise the Engineer of any discrepancy that may prevent or <br /> hinder the specified work from being completed. The Contractor shall be solely <br /> responsible for location and marking underground structures so as to avoid <br /> damage during construction. _ <br /> B. All contract documents shall be examined by the Contractor to verify the work <br /> can be installed without conflict. Any deviations from the drawings or any — <br /> additional work found to be required shall be reported to and approved by the <br /> Engineer before installing the work. The drawings do not show unknown piping <br /> utilities, buried structures, offsets, bends, special fittings or pull boxes necessary <br /> to meet all job conditions. These items shall be provided by the Contractor at no <br /> additional cost to the Owner. <br /> 1.09 MODIFICATIONS TO DESIGN <br /> A. The Contractor may propose modifications upon review of the project drawings <br /> and specifications and site verifications. These changes shall be limited to — <br /> component installation locations and will only be considered if documented that <br /> they will result in benefits to the Owner. Any proposed modification must be fully <br /> described and submitted by the Contractor and approved by the Engineer. — <br /> Modifications or additional materials shall be at no additional cost to the Owner. <br /> Any modifications shall incorporate all requirements of this specification. <br /> July 2007 Division III-135 NEI Phase II Water and Sewer — <br /> CIP Nos. 7468, 7589,7590 <br />