My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. The Signal System Shutdown Penalty as provided for herein may be waived by <br /> the City if the Contractor installs a temporary traffic signal system for signal <br /> system shutdowns. - <br /> 3.03 TESTING <br /> A. The Contractor shall have present, a qualified field technician, who shall be <br /> qualified to perform testing and servicing on all systems of the installation. <br /> B. The field technician shall perform all testing assignments. This testing shall <br /> include measurement of each loop installation repair utilizing a field loop <br /> tester/analyzer. <br /> C. The Contractor shall provide the Engineer with the detector test report as <br /> provided. <br /> 3.04 FUNCTIONAL TESTING <br /> A. The functional test for each lighting system shall consist of not less than 14 days. <br /> If unsatisfactory performance of the system develops, the conditions shall be <br /> corrected and the test shall be repeated until the 14 days of continuous, <br /> satisfactory operation is obtained. <br /> Division III-171 NEI Phase II Water and Sewer - <br /> July 2007 CIP Nos. 7468,7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.