Laserfiche WebLink
SECTION 16010 — ELECTRICAL (BID ITEMS 25 AND 26) <br /> PART 1 - GENERAL <br /> 1.01 SCOPE OF WORK <br /> A. The Contractor shall install, ready for use, the electrical and instrumentation system <br /> as specified herein and shown on the Contract drawings. This document describes <br /> the function and operation of the system and particular components, but does not <br /> necessarily describe all necessary devices. All components and devices shall be <br /> furnished and installed as necessary/required to provide a complete operable and <br /> reliable system for accomplishing the functions and meeting the performance set <br /> forth hereinafter. <br /> B. Furnish all required labor, materials, project equipment, tools, construction <br /> equipment, safety equipment, transportation, test equipment, incidentals, and <br /> services to provide a complete and operational electrical & instrumentation system <br /> as shown on the E&I -Series Drawings, included in these Specifications, or required <br /> for fully operating facility. <br /> C. The major areas in the scope of work shown on E&I -Series Contract Drawings and <br /> Device Index located in Appendix "B" which includes both the furnishing and <br /> installation are: <br /> 1. Pedestal, Automatic Transfer Switch, and associated hardware. <br /> 2. RTU Panel containing controls and other miscellaneous devices. <br /> 3. Instrumentation and other miscellaneous devices. This includes all wiring and <br /> cables. <br /> 4. New Tesco L2000 liquid level controller (LLC) no equal as shown on the (- <br /> series Drawings. L2000 to be programmed by System Supplier as described <br /> herein. <br /> 5. Radio system and communications commissioning. <br /> 6. Security system. <br /> 7. SC ADA Central PC (01) graphic and programming additions. <br /> 8. Conduits and the field interconnection wiring between all equipment, <br /> instrumentation, lighting, receptacles, etc. <br /> 9. Provide all necessary hardware, fittings, and devices to connect the <br /> designated equipment and wiring. <br /> 10. Installation, mounting supports, interconnection drawings, wiring, start-up, <br /> testing and warranty for all equipment and systems. <br /> 11. Provide trenching, backfilling, and compaction for all underground conduit <br /> routes, concrete pads, and pull boxes. <br /> 12. Secondary conduits & wire, bollards, pull boxes, etc. per PG&E Engineered <br /> Drawings for the revised utility power service. <br /> 13. Site electrical devices, lights and receptacles. <br /> 14. Modifications to existing NEI tank controls, L2000, and SCADA graphics. <br /> July 2007 Division III-172 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />