Laserfiche WebLink
15. All necessary miscellaneous shut off, sample, and calibration valves to <br /> sensors. <br /> 16. Coordination for connection of power utility service. <br /> 17. Grounding system and equipment grounding. <br /> 18. Remove and dispose of all excess dirt, paving, concrete, and other materials <br /> from site work. <br /> D. It is the Contractor's responsibility for obtaining LLC & SCADA configuration <br /> software, manuals and disks necessary for the Contractor to program and configure <br /> the LLC & SCADA PC. <br /> E. The following specifications incorporate specific equipment and devices that are — <br /> standards of the Owner because of their serviceability, because of the local <br /> availability of labor, parts and materials, or because of the ability of the Owner to <br /> umbrella the equipment under existing maintenance contracts; however, favorable — <br /> alternatives proposed in writing will be considered by the Owner. <br /> F. All electrical equipment and materials, including installation and testing, shall <br /> conform to the applicable codes and standards listed in this and other Sections. All _ <br /> electrical work shall conform with the National Electric Code (NEC) 2005 issue or <br /> applicable sections of the California Electric Code(CEC)2001 issue. Nothing on the — <br /> Drawings or in the Specifications shall be construed to permit work or materials not <br /> conforming to these codes and standards. <br /> G. It is the intent of the Owner to secure the highest quality of work for this project. _ <br /> System Supplier shall be responsible for supplying the control panels, pedestals, all <br /> field instruments listed for Section 16010, LLC&OI hardware and software with the <br /> associated programming, drawings, submittals, startup and testing, training and <br /> operations & maintenance manuals. The Suppliers listed below have been -- <br /> determined to meet minimum qualifications specified in this Division and are pre- <br /> qualified by the Owner for providing supplier bids as system suppliers on the project. <br /> Other suppliers may submit to Owner prior to bid opening a statement of qualification <br /> listing relevant experience on similar projects completed. The Owner will list <br /> additional prequalified suppliers in an addendum prior to bid opening. <br /> 1. Krug-Bixby-Long Associates (KBL) (phone 510 887-1117) <br /> 2. FluidlQ's (formerly CMC) (phone 707 258-8400) <br /> 3. Tesco (phone 916 395-8800) <br /> 4. MCC Control Systems (formerly Meyer Controls) (phone 707 449-0341) <br /> 1.02 RELATED WORK SPECIFIED IN OTHER SECTIONS <br /> A. Provide electrical system that interfaces to work performed under other mechanical <br /> and equipment plans. — <br /> Division III-173 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos. 7468, 7589, 7590 <br />