My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.03 CONTRACT DOCUMENTS <br /> A. The contract drawings and specifications are intended to be descriptive of the type of <br /> electrical system to be provided; any error, omission, or minor details missing in <br /> either shall not relieve the contractor from the obligations thereunder to install in <br /> correct detail any and all materials necessary for a complete operational system, at <br /> no additional cost. <br /> B. The Contract drawings are generally diagrammatic; exact locations of electrical <br /> products shall be verified in the field with the Engineer. Except where special details <br /> on drawings are used to illustrate the method of installation of a particular piece or <br /> type of equipment or materials, the requirements or descriptions in this Section shall <br /> take precedence in the event of conflict. <br /> C. Location at facilities of new equipment, inserts, anchors, panels, pull boxes, <br /> conduits, stub-ups, and fittings for the electrical system are to be determined by the <br /> Contractor and Engineer at time of installation. Contractor shall make minor <br /> adjustments to locations of electrical equipment required by existing conditions and <br /> coordination with other trades at no additional cost. <br /> D. The Contractor shall examine the architectural, mechanical,structural, electrical and <br /> instrumentation equipment provided under other Sections of this Contract in order to <br /> determine the exact routing and final terminations for all conduits and cables. The <br /> exact locations and routing of cables and conduits shall be governed by structural <br /> conditions, physical interferences, and the physical location of wire terminations on <br /> equipment. Conduits shall be stubbed up as near as possible to equipment. <br /> E. All equipment shall be installed and located so that it can be readily accessed for <br /> operation and maintenance. The Engineer reserves the right to require minor <br /> changes in location of equipment, without incurring any additional costs. <br /> F. Provide means to furnish equipment and accessories, do the installation, complete <br /> connections, submit documentation, perform start-up, and be responsible for the <br /> warranty. <br /> G. Where conduits are shown as"home runs" on the Contract drawings or stated to be <br /> furnished, but not explicitly shown as part of the scope of work; the Contractor shall <br /> provide all fittings, boxes, wiring, etc., as required for completion of the raceway <br /> system in compliance with the NEC and the applicable specifications in this Section. <br /> H. No changes from the Contract drawings or specifications shall be made without <br /> written approval of the Engineer. Should there be a need to deviate from the <br /> Contract documents, submit written details and reasons for all changes to the <br /> Engineer for favorable review. <br /> I. The resolution of conflicting interpretation of the Contract documents shall be as <br /> determined by the Engineer. <br /> J. It is the system suppliers responsibility for obtaining LLC, Ol, and instrumentation <br /> transmitter configuration software, manuals and disks necessary for the Contractor <br /> to program and configure the LLC, Ol, and instrumentation transmitters. <br /> 1.04 SUBMITTAL AND DRAWING REQUIREMENTS <br /> A. Submit six(6)sets of shop documents and drawings for approval in accordance with <br /> this subsection and the City of Tracy's Standard Specifications Submittal Section. <br /> July 2007 Division III-174 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.