q. Interconnection diagrams shall be submitted and approved by Owner for <br /> each electrical and instrumentation system. The Contractor shall not <br /> pull in any wires into conduits that do not have approved interconnects. <br /> If the Contractor pulls in wire without Owner approval of associated <br /> Interconnect Drawings, the Contractor will not be reimbursed for labor <br /> for re-pulling in wires even if there was an error in wire fill or sizing. <br /> Also, if the Contractor pulls in wire without Owner approval of associated <br /> Interconnect Drawings, then all progress payments related to field wiring <br /> for that particular area of work will be withheld until approved <br /> Interconnect Drawings are in use. <br /> r. Format and detail of Interconnection diagrams shall be similar to that <br /> shown on Contract "E" series drawings. <br /> S. All Interconnection wires listed in the conduit schedule for each conduit <br /> shall be shown only on one interconnect drawing. Interconnection <br /> Drawings shall use bundled wire format as shown on example <br /> interconnect Contract Drawing. Interconnect drawings submitted with <br /> wiring of a single conduit run separated onto multiple interconnect <br /> drawings will be rejected without review. A single conduit run with wiring <br /> shown on separate interconnect drawings will be allowed only after <br /> written approval is given by the Engineer for each conduit run prior to <br /> submitting the associated interconnect drawings. <br /> t. Only field wiring between pedestals, Panelboards, Control Panels, and <br /> Other electrical and instrumentation devices or equipment shall be <br /> shown on interconnection drawings. No internal panel wiring shall be <br /> shown on interconnect drawings except jumper or other wiring to be <br /> installed in field by Electrical Contractor. <br /> U. Interconnect Drawings along with the corresponding support documents <br /> shall be submitted in a separate submittal package. Interconnect <br /> drawings submitted with non interconnect drawing packages will be <br /> rejected. <br /> V. Interconnect drawings shall be prepared for all equipment bythe System <br /> Supplier with the exception of the Telephone System and Security Alarm <br /> System which may be produce their own interconnect drawings. <br /> W. Provide a notes section on each interconnect drawing. In the note <br /> section, list any variances from the Contract conduit schedule necessary <br /> for completing the interconnections. Change orders regarding wire fill, <br /> conduit schedule and errors in plans regarding conduits and wires will <br /> not be processed until interconnect drawings have been received for <br /> such work. <br /> X. The field electrician shall mark-up all interconnection diagrams during <br /> installation to show accurate as-built wiring, conduits runs,terminations, <br /> etc. If interconnection drawings are not properly as-built, the Electrical <br /> Contractor will have cost deducted from the Contract for the Owner to <br /> field verify and prepare as-built interconnection drawings amount. The <br /> amount of the deduction shall be determined on a time and material <br /> basis. The cost of such work shall be $120.00 per hour plus expenses. <br /> July 2007 Division III-178 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />