Laserfiche WebLink
y. The system supplier shall be responsible to collect all information <br /> necessary to complete each interconnection drawing. This includes <br /> making field trips to collect all terminal connection data for new and <br /> existing, pedestals, switchboards, panelboards, instruments, equipment <br /> and electrical panels. <br /> 6. Submit full size drawing of all nameplates and tags, as specified herein,to be <br /> used on project. The Engineer has the right to adjust nameplate engraving <br /> titles during submittals at no additional cost to the Owner. Submittal to include <br /> the following: <br /> a. Dimensions of nameplate <br /> b. Exact lettering and font for each nameplate <br /> C. Color of nameplate <br /> d. Color of lettering — <br /> e. Materials of construction <br /> f. Method and materials for attachment <br /> g. Drawing showing location of nameplates on each pedestal, panel, and <br /> enclosure <br /> C. The electrical submittals shall include but not be limited to data sheets and drawings <br /> for each product together with the technical bulletin or brochure. No fax copies of <br /> documents are allowed. Color copies shall be provided when black and white copies <br /> do not show adequate clarity. The electrical submittals shall include: <br /> 1. Product (item) name used herein and on the Contract Drawings. <br /> 2. The manufacturer's model or other designation. <br /> 3. Tag name/number per the drawings, schedules, and indexes. <br /> 4. Detailed electrical one or three line, elementary and loop diagrams showing all _ <br /> wiring requirements for each system. <br /> 5. Complete catalog cuts with full description of equipment. General sales _ <br /> literature will not be acceptable. The part or model number with options to be <br /> provided shall be clearly identified. Where more than one item or catalog <br /> number appears on a catalog cut, the specific item(s) or catalog numbers(s) <br /> proposed shall be clearly identified. <br /> 6. Location of assembly at which it is installed. <br /> 7. Input-output characteristics. <br /> 8. Range, size, and graduations as required. <br /> 9. Physical size with dimensions and mounting details. — <br /> 10. Enclosure fabrication and color. <br /> 11. Enclosure layout and elevation drawings to scale. <br /> 12. Quantity and quality requirements for electric power. <br /> 13. Materials of construction of components. — <br /> Division III-179 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos.7468, 7589, 7590 <br />