My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
water during flushing operations and grade the bermed area upon — <br /> completion so as to return the area to its pre-construction conditions. <br /> ITEM NO. 8 — <br /> Division III — Special Provisions, Section 3, Water Transmission Mains", Page <br /> III-9, Eleventh Paragraph, the second sentence shall be modified to read: <br /> If the specified bacteriological requirements are not met, including the <br /> requirements specified in Attachment A of these specifications, the <br /> disinfecting procedure must be repeated until the requirements are met. <br /> I TEM NO. 9 <br /> Division III - Special Provisions, Section 2140 "Control of Groundwater and <br /> Surface Water," Section 1.01 C shall be modified to read: <br /> Collection, treatment, and disposal of removed water to the City stormwater <br /> system for all portions of the project south of 1-205. Discharge points include <br /> an existing 18-inch diameter storm drain on the north side of Pescadero <br /> Road and an existing 18-inch diameter storm drain on the east side of <br /> Chrisman Road. <br /> ITEM NO. 10 <br /> Division III — Special Provisions, Section 02140 "Control of Groundwater and <br /> Surface Water", Section 2.01 shall include the following additional paragraph: <br /> E. The groundwater control system for trench dewatering shall be <br /> designed with hard pipe (no open ditches), and may discharge into _ <br /> the City's storm water system. <br /> ITEM NO. 11 — <br /> Division III — Special Provisions, Section 02200 "Earthwork", Section 2.01 (E) <br /> shall be modified such that the Geotextile Fabric used shall be Mirafi 140 NL, <br /> Amorco 2002, Contech C-200, or equal. <br /> ITEM NO. 12 <br /> Division III — Section 11100, "Sluice Gates" shall be eliminated. <br /> ITEM NO. 13 - <br /> Division III — Section 15100, "Piping Systems", Section 2.03 F, "Bolts, Nuts, <br /> Washers, and Gaskets"—The first paragraph, second sentence shall read, <br /> "Bolts and nuts for buried flanges and fittings shall be Type 304 stainless steel. - <br /> The last paragraph shall be modified to state, "Gaskets for push-on joints shall <br /> be in accordance with the current standard for "Rubber Gasket Joints for <br /> Ductile Iron Pressure Pipe and Fittings" (ANSI/AVWVA A21.11/C-111)". <br /> ITEM NO. 14 <br /> Addendum No. 3 -August 24, 2007 <br /> Northeast Industrial Phase II Water and Sewer Project <br /> CIP 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.