My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the full compensation for furnishing all materials, labor, tools and equipment for performing the <br /> work, and for all other incidentals necessary to complete the work as shown on the plans and <br /> described in these specifications. <br /> No separate payment will be made for incidentals or any items delineated on the plans or called <br /> for in the specifications to be supplied and installed which are not specifically listed as bid items <br /> but are required to complete the project. Full compensation for such items shall be considered <br /> as included in the prices paid for the various contract items of work involved and no additional <br /> compensation will be allowed. <br /> Payment will not be made for materials and wastes disposed of in a manner not called for <br /> under contract. This includes, but is not limited to, rejected material not unloaded from <br /> vehicles, material rejected after it has been placed and material placed outside of the plan <br /> lines. No payment will be made for materials delivered to the site but not incorporated in the <br /> work. No compensation will be allowed for disposing of any removed, rejected or excess <br /> material. <br /> Payment for lump sum items of work shall be made in accordance with Section 9-2 "Lump Sum <br /> Work" of the SSPWC. Contractor shall submit to the Engineer, at the Pre-construction <br /> Conference, a detailed schedule or breakdown of lump sum pay items, to be used as a basis <br /> for determining progress payments on lump sum work. <br /> SECTION 20 - QUANTITIES <br /> The quantities listed in the bid schedule are approximate only, supplied as a general indication <br /> of the scope of work and to be used as a basis for comparing bids. The City does not <br /> expressly or by implication agree that the actual amount of work will correspond therewith, and <br /> reserves the right to increase or decrease the amount of any class or portion of the work, or to <br /> delete any portions of the work in their entirety, from the quantities listed on the bid schedule, <br /> provided within these specifications. <br /> Payment to the Contractor will be made only for the actual quantities of contract items <br /> constructed in accordance with the plans and specifications. <br /> If upon completion of the project, the actual quantities constructed show either an increase or <br /> decrease from the estimated quantities shown on the bid schedule, a change order shall be <br /> issued for the difference in quantity for each bid item, at the contract unit price. <br /> Unless otherwise noted, the following shall apply: <br /> • All quantities and pay items are based on horizontal measurements. <br /> • Stationing is along street centerline. <br /> • Lengths of sanitary sewers, storm drains and water lines are horizontal distances from <br /> center to center of structures, rounded to the nearest foot. <br /> • All return radii and curb data are to, and shall be measured along, face of curb. <br /> SECTION 21 — EXTRA WORK <br /> New or unforeseen work will be deemed as "Extra Work" when the Engineer determines that it <br /> is not covered by contract unit prices or stipulated in the contract documents and the character <br /> of such work is substantially different from that on which the contractor bid. Payment for extra <br /> July 2007 Division II - 8 <br /> NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.