Laserfiche WebLink
provided in Section 9-1.03, "Force Account Payment", of the State Standard Specifications for <br /> increased work, and estimated on the same basis in the case of decreased work. — <br /> In lieu of payment as extra work as specified in Section 7-1.08, of the State Standard <br /> of furnishing, installing and maintaining signs, lights, barricades, and <br /> Specifications, the cost <br /> he safety, sole convenience, and direction of public traffic around the work <br /> other facilities for t <br /> area, all as shown he the plans or as directed by the Engineer, shall be considered as included <br /> and no additional compensation will be allowed. <br /> in the various Contract items of work <br /> B. Submittals <br /> Prepare and Submit a Traffic Control Plan <br /> prep r d by a tCalifornia Registered Engineer in _ <br /> accordance with Section 01300 and t g <br /> 1. The determination of required protective devices and directional m sures is the <br /> responsibility of the Contractor. �'/ <br /> 2. Traffic Control Plan shall be in accordance wit the Traffic Control Manua . — <br /> 3. Identify proposed equipment and locations for traffic control measu <br /> Ic contro <br /> devices, and barricades. Also provide locations of lane width reductions and lane <br /> shutdowns. <br /> 4. Do not start work within a Work Zone until <br /> troTraffic <br /> devices areControl <br /> pn place.and Public <br /> Information Campaign Is approved and traffic con <br /> where <br /> 5. Traffic control plans shall consist of scaled drawings of eet h streework is <br /> proposed with the detail of all traffic control measures proposed peach fo <br /> 6. Implement the approved Traffic Control Plan, haul routes, detours, road closures, <br /> pedestrian traveled way and re-routing traffic control maintenance. <br /> 7. Include notifying the owner of each private driveway. <br /> 8. Written notice shall be submitted in accordance with Section 01300 to the City and <br /> County for approval prior to delivery. <br /> C. Traffic Control Requirements <br /> Conduct work within public right-of-ways in compliance with the following agency's permit <br /> requirements: _ <br /> 1. State of California Department of Transportation <br /> 2. County of San Joaquin <br /> 3. City of Tracy <br /> Provide and maintain temporary traffic control measures to provide for the safe passage of <br /> vehicular and pedestrian traffic through and within the Project site. <br /> NEI Phase II Water and Sewer <br /> July 2007 <br /> Division III-3 CIP Nos.7468, 7589, 7590 <br />