My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 San Joaquin County Road Department <br /> 2 County Sheriff Department <br /> 3 Regional 911 <br /> 4 Regional Transit <br /> 5 City of Tracy Police Department <br /> 6 City of Tracy Fire Department <br /> 7 City Tracy School District <br /> Notify US Post Office, waste haulers, recycling operations and buses within the project area. <br /> Coordinate to ensure no stoppage of mail delivery. <br /> Schedule work in project area to minimize disturbance to bus service operations. <br /> Post "No Parking, Tow Away" signs on barricades along the roadway at least 48 hours prior to <br /> the construction work in that area. <br /> Provide message boards along the roadway at least 2 weeks prior to the construction in that <br /> area. Electronic message boards shall provide dates for impending construction and lane <br /> closures. <br /> E. Temporary Signs -- <br /> Provide, erect and maintain Construction Area Signs. Remove signs when no longer required. <br /> All temporary signs shall comply with the Traffic Control Manual and Section 12 of the Caltrans _ <br /> Standard Specifications. <br /> Erect information signs advising pending work and lane closures two weeks in advance of <br /> actual work. Place information signs so that they are readable to both directions of travel. <br /> Erect signs advising of rough road conditions when temporary pavement has been placed. <br /> Use electronic signs with sequential arrow or changeable message to advise traffic of <br /> approaching conditions. <br /> F. Temporary Barriers and Channelizing Devises <br /> Barriers and channelizing devises shall comply with the Traffic Control Manual. <br /> Install temporary barricades to protect vehicles for areas with drop-offs or to isolate traffic from <br /> dewatering or bypass pumps and pipelines. <br /> Temporary barricades shall be provided and installed in compliance with Section 12 of the State <br /> Standard Specifications. <br /> Temporary k-rail end sections not protected by crash cushions must be flared so that the blunt <br /> end of the k-rail is at least 15 feet away from approaching traffic. K-rail end sections within <br /> 15 feet of approaching traffic shall be protected by crash cushions. <br /> July 2007 Division III-5 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.