directed by the Engineer. Trench excavation shall conform to the provisions of City Standard <br /> Plan No, 501, Section 306 of the City Standard Specifications. The Contractor's attention is <br /> directed to Section 26 "Disposal of Material' of the Special Requirements of these <br /> Specifications. <br /> B. Requirements <br /> For any excavations more than five feet (5') deep, the Contractor shall submit to the Engineer, <br /> the structural calculations to verify the structural safety and adequacy of the sheeting, shoring <br /> and bracing to be used on the project. No such plan shall allow shoring, sloping or a protection <br /> system less effective than that required by the Construction Safety Orders of the State Division <br /> of Occupational Safety and Health. The structural calculations must be prepared, stamped and <br /> signed by a Registered Engineer licensed to practice in the State of California. Sheeting, <br /> shoring, and/or bracing of open cut excavations shall be provided, inclusive of all construction <br /> conforming to applicable safety orders, including any necessary subsurface investigations, <br /> preparing and submitting shoring designs, labor, tools, materials, equipment, power, and fuel for <br /> doing all required work: including but not limited to that as required by Sections 6700-6708 of the <br /> Labor Code. <br /> C. Schedule <br /> At least 30 days prior to commencing work requiring excavation sheeting and shoring on this <br /> project, the Contractor shall submit to the City in accordance with Section 01300 a plan and <br /> schedule of construction which will allow the least inconvenience to the public and/or residents. <br /> MEASUREMENT AND PAYMENT <br /> Trench Excavation Safety (Bid Item 2) shall be paid for on a lump sum basis. Measurement will <br /> be based on the percentage of work completed as determined by the Engineer, and the detailed <br /> schedule or breakdown of lump sum items as approved by the Engineer. <br /> The contract lump sum price paid for trench excavation safety will include full compensation for <br /> conforming to these requirements, including all shoring and bracing on all Bid Items furnishing <br /> all labor, materials, tools, equipment, and doing all work for design, installation, and removal or <br /> abandonment of sheeting, shoring, bracing, and other excavation supports, including but not <br /> limited to, that as required by Section 6700-6708 of the Labor Code, all the labor, materials, <br /> tools, equipment and incidentals for doing all the work involved and appurtenant facilities. <br /> The lump sum price paid shall include full compensation for furnishing all labor, materials, tools, <br /> equipment and incidentals and for doing all the work, complete and in place, all as shown on the <br /> drawings, specified in the Standard Specifications, these special provisions, and as directed by <br /> the Engineer, and no additional compensation will be allowed. <br /> SECTION 3 -WATER TRANSMISSION MAINS (BID ITEMS 3 4 5 6 7 8 9 AND 10) <br /> The work of this section consists of construction of 12- inch and 18-inch diameter ductile iron <br /> water mains, water valves, 2-inch combination air valves, 4-inch blowoffs, and related work. <br /> The work shall consist of staking, pavement removal, trench excavation, dewatering, placement <br /> of new water pipe, fittings, tees, crosses, valves, transition couplings, reducers, thrust blocks, <br /> July 2007 Division III-8 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />