My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
connecting to existing mains for the Engineer's approval to minimize contamination danger. <br /> Connections to existing facilities prior to obtaining satisfactory tests required by these <br /> specifications and the City of Tracy Standard Specifications will not be allowed. <br /> MEASUREMENT AND PAYMENT <br /> 18" Water Mains (Bid Item 3) and 12" Water Mains (Bid Item 4) shall be paid for on a linear <br /> foot basis. Measurement will be based on the actual number of linear feet of pipe installed as <br /> determined by measurement along the pipeline. <br /> Full compensation for conforming to these requirements includes all the work involved in water <br /> pipe installation including excavation, pavement removal, dewatering, furnishing and placement <br /> of water pipe, fittings, couplings, bedding, fabric wrap around pipe bedding, polywrap around <br /> pipe, backfill and compaction, temporary paving, testing, disinfecting, and coatings for <br /> completion of the work:. <br /> Water main connection shall be installed only under City and SSJID approval and continuous <br /> inspection. No payment will be made for water main connection not installed under City and <br /> SSJID approval and continuous inspection. <br /> Steel water pipe and valves at the NEI tank and pump station site will be paid for as part of the <br /> NEI Tank Site Improvements bid item. <br /> 16" Butterfly Valves (Bid Item 5) and 12" Butterfly Valves (Bid Item 6) shall be paid for on a unit <br /> basis. Measurement for unit price work will be based on the actual number of units installed, <br /> complete in place, as determined by the Engineer, and the unit price bid as approved by the <br /> Engineer. <br /> 2" Combination Air Release / Vacuum Valves (Bid Item 7) shall be paid for on a unit basis. <br /> Measurement for unit price work will be based on the actual number of units installed, complete <br /> in place, as determined by the Engineer, and the unit price bid as approved by the Engineer. <br /> 4" Blowoffs (Bid Item 8) shall be paid for on a unit basis. Measurement for unit price work will <br /> be based on the actual number of units installed, complete in place, as determined by the <br /> Engineer, and the unit price bid as approved by the Engineer. <br /> The contract unit price paid for unit price work shall include full compensation for furnishing all <br /> the labor, materials, tools, equipment, incidentals and for doing all the work involved in <br /> installation, complete and in place, all as shown on the drawings, specified in the Standard <br /> Specifications, these special provisions, and as directed by the Engineer, and no additional <br /> compensation will be allowed. <br /> Water Main Cut In at P'escadero Avenue (Bid Items 9) shall be paid for on a lump sum basis. <br /> Measurement will be based on the percentage of work completed as determined by the <br /> Engineer, and the detailed schedule or breakdown of lump sum items as approved by the <br /> Engineer. <br /> Water Main Cut In at Grant Line Road (Bid Items 10) shall be paid for on a lump sum basis. <br /> Measurement will be based on the percentage of work completed as determined by the <br /> Engineer, and the detailed schedule or breakdown of lump sum items as approved by the <br /> Engineer. <br /> July 2007 Division III-10 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.