My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The contractor shall remove and replace any sanitary sewer pipe failing the test, re-backfill and <br /> compact the trench at his own cost. The contractor shall furnish all necessary labor, material, <br /> tools, and equipment to perform the required inspection. <br /> MEASUREMENT AND PAYMENT <br /> 12" Sanitary Sewer (Bid Item 12) and 18" Sanitary Sewer (Bid Item 13) shall be paid for on a <br /> linear foot basis. Measurement will be based on the actual number of linear feet of sewer main <br /> installed as determined by measurement along the sewer invert from center of manhole to <br /> center of manhole. <br /> The contract unit price paid shall include full compensation for all labor, material, equipment, <br /> including trenching, pavement removal, backfill, connection to the existing sewer lines and <br /> manholes, temporary paving, sewer main bypassing, and incidentals for doing all work involved, <br /> for the complete installation of the sanitary sewer pipe, all as shown on the drawings, specified <br /> in the Standard Specifications, these Special Provisions, and as directed by the Engineer and <br /> no additional compensation will be allowed. <br /> Sanitary Sewer Manholes In Paved Areas (Bid Item 14) and Sanitary Sewer Manholes In <br /> Unpaved Areas (Bid Item 15) shall be paid for on a unit basis as one complete installed unit <br /> including manhole base, cast iron ring, frame and cover. Measurement will be based on the <br /> actual number of manholes installed as determined by actual count. The contract unit price per <br /> Sanitary Sewer Manholes shall include full compensation for labor, materials, tools and <br /> equipment and for doing all work for the removal and complete installation of the sanitary sewer <br /> manhole, including excavation, backfill, paving, PVC liner and sealed joints, stubs, installation of <br /> concrete slabs and permanent bollards, testing, complete in place, all as shown on the <br /> drawings, specified in the Standard Specifications, these special provisions, and as directed by <br /> the Engineer, and no additional compensation will be allowed. <br /> SECTION 6 — MACARTHUR PUMP STATION PIPE REPLACEMENT (BID ITEM 16) <br /> The work of this bid item consists of pipe replacement within the existing MacArthur Wastewater <br /> Pump Station Wet Well including new pipe and coatings and all other work required for a <br /> complete operating installation. <br /> Pipe and fittings shall be epoxy lined and coated ductile iron pipe conforming to the <br /> requirements of Section 15100 and related sections of the Special Provisions. <br /> MEASUREMENT AND PAYMENT <br /> MacArthur Pump Station Pipe Replacement (Bid Item 16) shall be paid for on a lump sum <br /> basis. Measurement will be based on the percentage of work completed as determined by the <br /> Engineer, and the detailed schedule or breakdown of lump sum items as approved by the <br /> Engineer. <br /> The contract lump sum price paid for MacArthur Pump Station Pipe Replacement will include full <br /> compensation for conforming to these requirements for doing all the work involved in the <br /> removal the existing 10-inch diameter ductile iron pipe in the wet well; furnishing and installing <br /> new 10-inch diameter ductile iron piping including furnishing and installing pipe, supports, <br /> fasteners, linings, coatings, safe entry into confined space, and incidentals required for a <br /> complete and operable system. Replacement of the pumps, discharge elbows, guide rails and <br /> July 2007 Division III-12 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.