brackets, bypassing/control of wastewater flow, and other items not specifically included in this <br /> bid item are included in the Bid Item 17. <br /> The lump sum price paid shall include full compensation for furnishing all labor, materials, tools, <br /> equipment and incidentals and for doing all the work, complete and in place, all as shown on the <br /> drawings, specified in the Standard Specifications, these special provisions, and as directed by <br /> the Engineer, and no additional compensation will be allowed. <br /> SECTION 7 MACARTHUR PUMP STATION IMPROVEMENTS (BID ITEM 17) — <br /> The work of this bid item consists of improvements at the existing MacArthur Wastewater Pump <br /> Station including new pumps and all other work required for a complete operating installation <br /> except for wet well piping and electrical and instrumentation. <br /> Submersible pumps shall conform to the requirements of Section 11310 of the Special <br /> Provisions. Pump station rehabilitation and related improvements shall conform to applicable — <br /> sections of the Special Provisions. <br /> MEASUREMENT AND PAYMENT — <br /> MacArthur Pump Station Improvements (Bid Item 17) shall be paid for on a lump sum basis. <br /> Measurement will be based on the percentage of work completed as determined by the — <br /> Engineer, and the detailed schedule or breakdown of lump sum items as approved by the <br /> Engineer. <br /> The contract lump sum price paid for the MacArthur Pump Station Improvements will include full <br /> compensation for conforming to these requirements for doing all the work including equipment <br /> factory and field testing; training City staff in operation and maintenance; services of <br /> manufacturers' representatives; site clearing and pavement demolition; dewatering, asphalt — <br /> paving; pipe testing, leakage testing and testing of all types; maintaining sewer flow including <br /> but not limited to flow control, off-hours work, bypass pumping; demolition and removals except <br /> those listed in Bid Item for pipe replacement; removal and delivery to City of Tracy salvaged _ <br /> pumps, motors, valves, control panels, and other items indicated for salvage; connection to <br /> existing piping systems; furnish and install storm drain pumping structure including concrete <br /> structure and appurtenances, pumps, piping, valves and fittings; furnish and install main _ <br /> submersible wastewater pumps and appurtenances; painting and coatings; remove and replace <br /> existing access hatches with new hatches on new curbs at the wet well and valve vault; furnish <br /> and install new bypass connection plug valve and quick coupling assembly; start-up services; <br /> and start-up and training. <br /> The lump sum price paid shall include full compensation for furnishing all labor, materials, tools, <br /> equipment and incidentals and for doing all the work, complete and in place, all as shown on the <br /> drawings, specified in the Standard Specifications, these special provisions, and as directed by <br /> the Engineer, and no additional compensation will be allowed. <br /> SECTION 01012 —WORK CONSTRAINTS <br /> Construction activities shall be scheduled in such a manner to limit construction disturbances _ <br /> and site disruption at each work site. The following constraints shall be followed during <br /> construction of the water and sewer improvements and appurtenance there to: <br /> Division III-13 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos. 7468, 7589, 7590 <br />