Laserfiche WebLink
• Aggregate shall be of such quality that,when mixed with cement in an amount not to exceed 180 kg per cubic meter, <br /> and tested in conformance with the requirements in California Test 548,the compressive strength of a sample will be not less <br /> than 5.0 MPa at 7 days. <br /> SECTION 29: TREATED PERMEABLE BASES <br /> Issue Date: January 5,2007 <br /> The fourth paragraph of Section 29-1.02A,"Asphalt Treated Permeable Base,"of the Standard Specifications is amended _ <br /> to read: <br /> • The type and grade of asphalt binder to be mixed with aggregate will be specified in the special provisions. <br /> The second paragraph of Section 29-1.02B, "Cement Treated Permeable Base," of the Standard Specifications is <br /> amended to read: <br /> • Cement shall be Type II portland cement conforming to the provisions in Section 90-2.01A,"Cement." <br /> The second paragraph of Section 29-1.04B, "Cement Treated Permeable Base," of the Standard Specifications is <br /> amended to read: <br /> • Cement treated permeable base shall contain not less than 170 kg of cement per cubic meter. <br /> SECTION 39: ASPHALT CONCRETE <br /> Issue Date: November 18,2005 <br /> The fifth paragraph of Section 39-2.01,"Asphalts,"of the Standard Specifications is amended to read: <br /> • Paving asphalt to be used as a binder for pavement reinforcing fabric shall be a steam-refined paving asphalt <br /> conforming to the provisions in Section 92,"Asphalts,"and shall be Grade PG 70-10. <br /> SECTION 40: PORTLAND CEMENT CONCRETE PAVEMENT <br /> Issue Date: January 5,2007 <br /> Section 40-1.015,"Cement Content,"is deleted. <br /> Section 40-1.05,"Proportioning,"of the Standard Specifications is amended to read: <br /> • Aggregate and cementitious material proportioning shall conform to the provisions in Section 90-5,"Proportioning." <br /> The first paragraph in Section 40-1.105,'Exit Ramp Termini,"of the Standard Specifications is amended to read: <br /> • Concrete pavement shall be constructed at the ends of exit ramps when required by the plans or the special <br /> provisions. Texturing for exit ramp termini shall be by means of heavy brooming in a direction normal to ramp centerline. <br /> The hardened surface shall have a coefficient of friction not less than 0.35 as determined by California Test 342. Minimum <br /> cementitious material content of concrete in pavement for exit ramp termini shall be 350 kg/m3. <br /> The fourth paragraph of Section 40-1.08,"Joints,"of the Standard Specifications is amended to read: <br /> • Straight tie bars shall be deformed reinforcing steel bars conforming to the requirements in ASTM Designation: <br /> A 615/A 615M, Grade 280 or 420; ASTM Designation: A 996/A 996M, Grade 350 or 420; or ASTM Designation: <br /> A 706/A 706M. <br /> The first paragraph in Section 40-1.14,"Payment,"of the Standard Specifications is amended to read: <br /> Contract No. 10-OM7104 <br /> 20 <br />