My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:10 AM
Creation date
12/30/2015 9:44:57 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-352
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
RICHARD A. HEAP ELECT. CONT.
Contracts
CrossReference
Date Entered
11/15/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
INTERSECTION OF FRENCH CAMP RD. & I-5
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The fourth paragraph in Section 56-2.03,"Construction,"of the Standard Specifications is amended to read: <br /> • Backfill material for metal posts shall consist of minor concrete conforming to the provisions in Section 90-10, <br /> "Minor Concrete,"and shall contain not less than 275 kilograms of cementitious material per cubic meter. <br /> SECTION 57: TIMBER STRUCTURES <br /> Issue Date: October 12,2004 <br /> The second paragraph of Section 57-1.02A, "Structural Timber and Lumber," of the Standard Specifications is amended <br /> to read: <br /> • When preservative treatment of timber and lumber is required, the treatment shall conform to the provisions in <br /> Section 58, "Preservative Treatment of Lumber, Timber and Piling," and AWPA's Use Category 4B. The type of treatment <br /> to be used will be shown on the plans or specified in the special provisions. <br /> SECTION 58: PRESERVATIVE TREATMENT OF LUMBER,TIMBER AND PILING <br /> Issue Date: November 18,2005 <br /> The first paragraph of Section 58-1.02,"Treatment and Retention,"of the Standard Specifications is amended to read: <br /> • Timber, lumber, and piling shall be pressure treated after millwork is completed. Preservatives, treatment, and <br /> results of treatment shall conform to the requirements in AWPA Standards Ul and T1. Treatment of lumber and timber shall <br /> conform to the specified AWPA Use Category cited in the special provisions, on the plans, or elsewhere in these <br /> specifications. <br /> The second paragraph of Section 58-1.02,"Treatment and Retention,"of the Standard Specifications is deleted. <br /> SECTION 59: PAINTING <br /> Issue Date: June 30,2006 <br /> The first paragraph of Section 59-1.02,"Weather Conditions,"of the Standard Specifications is amended to read: <br /> • Paint shall be applied only on thoroughly dry surfaces and during periods of favorable weather. Blast cleaning or <br /> application of solvent-borne paint will not be permitted when the atmospheric or surface temperature is at or below 2°C or <br /> above 38°C,or when the relative humidity exceeds 85 percent at the site of the work. Application of water-borne paint will <br /> not be permitted when the atmospheric or surface temperature is at or below 10°C, or above 38°C, or when the relative <br /> humidity exceeds 75 percent at the site of the work. Application of paint will not be permitted when the steel surface <br /> temperature is less than 3°C above the dew point, or when freshly painted surfaces may become damaged by rain, fog or <br /> condensation,or when it can be anticipated that the atmospheric temperature or relative humidity will not remain within the <br /> specified application conditions during the drying period, except as provided in the following paragraph for enclosures. If <br /> uncured paint is damaged by the elements,it shall be replaced or repaired by the Contractor at the Contractor's expense. <br /> The second paragraph of Section 59-1.05, "Protection Against Damage," of the Standard Specifications is amended to <br /> read: <br /> • Paint or paint stains on surfaces not designated to be painted shall be removed by the Contractor at the Contractor's <br /> expense and to the satisfaction of the Engineer. <br /> Section 59-2.01, "General," of the Standard Specifications is amended by adding the following paragraphs after the first <br /> paragraph: <br /> • Unless otherwise specified,no painting Contractors or subcontractors will be permitted to commence work without <br /> having the following current"SSPC: The Society for Protective Coatings" (formerly the Steel Structures Painting Council) <br /> certifications in good standing: <br /> Contract No. 10-OM7104 <br /> 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.