My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-1000 thru EP-08-1999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:53:01 AM
Creation date
12/30/2015 8:43:38 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-1584
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-1000 thru EP-08-1999
Year2
2008
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
EP-08-1584
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 02310 <br /> HORIZONTAL DIRECTIONAL DRILLING <br /> 5. Procedures for eliminating, isolating or controlling identified hazards shall be <br /> included. <br /> 6. Job-site safety meetings. <br /> M. Risk Contingency Plan <br /> Risk Contingency Plan to identify the major anticipated risks and develop general plans for <br /> resolving them. As a minimum the following shall be addressed: <br /> 1. Failure to complete the bore. <br /> 2. Loss of circulation. <br /> 3. Obstructions. <br /> 4. Inaccurate tracking and/or steering. <br /> 5. Collapse of borehole. <br /> 6. Product pipe failure. <br /> 7. Stuck product pipe. <br /> 8. Surface heave and/or subsidence. <br /> 9. Hydrofracture and inadvertent returns. <br /> 10. Calculations for pulling forces during pullback including pulling stresses on <br /> individual pipes. <br /> 11. Manufacturer's data sheets and certifications of HDPE pipe. <br /> 12. Calibration data for all instrumentation. <br /> 13. Names and qualifications of Contractor's key project personnel including site <br /> foreman, drilling operator, drill locator, mud specialist, safety person, and <br /> environmental representative. <br /> Walnut Grove Sewer Project(Conformed) 02310-6 SA0160401 <br /> March 2008 N:\sa0160401\Specs\WG Conform\Div 2\02310.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.