My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2102501 thru PS-2103000_ - PS-2102647
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2021
>
PS-2102501 thru PS-2103000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2102501 thru PS-2103000_ - PS-2102647
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 10:56:00 AM
Creation date
11/22/2022 10:48:18 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2102647
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2021
Notes2
South Airport Way
Address
9796 Kent St., Elk Grove,CA 95624
Application
Pacific Excavation Inc.
Type
Trench
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- INTERSECTION SHALL BE WIRED FOR 8 VEHICLE PHASES AND 4 PED PHASES. <br />- APS CABLE SHALL BE BELDON #28326A BETWEEN BUTTON AND PED HEAD. <br />N) <br />405' T <br />2A LIMIT LINE <br />R <br />POLE LOCATION TABLE <br />CONDUCTOR <br />DIM. A <br />SCHEDULE <br />O <br />24.5' <br />5.0' <br />© <br />AWG <br />CIRCUIT <br />Q <br />Q <br />Q <br />Q <br />RUN <br />Q <br />Q <br />Q <br />Q <br />Q <br />O <br />01 SIGNALS FUTURE <br />3 <br />3 <br />3 <br />3 <br />O <br />28.0 <br />10.5' <br />~ <br />(n <br />2"C,316(SIGNALS) <br />02 SIGNALS <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 2"C,3#2 <br />Q <br />FEET. <br />03 SIGNALS <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />° <br />j <br />04 SIGNALS FUTURE <br />3 <br />3 <br />PLACE <br />POLE <br />FOR <br />ULTIMATE <br />GRADE. <br />3 <br />FINISH <br />SIDEWALK = <br />05 SIGNALS <br />6 <br />6 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />FINISH <br />06 SIGNALS <br />6 <br />6 <br />3 <br />3 <br />3 <br />07 SIGNALS FUTURE <br />3 <br />3 <br />LEFT <br />O1-13 <br />10' <br />3 <br />08 SIGNALS(FUTURE) <br />3 <br />3 <br />3 <br />3 <br />3 <br />02 PED FUTURE <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />29-5-100 <br />30' <br />#14 <br />04 PED FUTURE <br />4 <br />4 <br />2 <br />2 <br />2 <br />2 <br />Tidewater Crossing" SIGN. <br />2 <br />06 PED <br />4 <br />4 <br />2 <br />1 SV -1-T <br />INSTALL R9-3 SIGN ON POLE. ❑4 ® 75 16 <br />2 <br />2 <br />08 PED FUTURE <br />4 <br />4 <br />2 <br />2 <br />2 <br />TV- 1-T <br />17 <br />©26-4-100 <br />02 PPB FUTURE <br />4 <br />4 <br />4 <br />4 <br />4 <br />2 <br />MAS -4B <br />INSTALL R3-4 SIGN AND D3 <br />Airport Way" SIGN. <br />04 PPB FUTURE <br />4 <br />4 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />06 PPB <br />q <br />q <br />10' <br />02 <br />2 <br />N -1-T <br />08 PPB FUTURE <br />4 <br />4 <br />4 <br />2 <br />PEU <br />3 <br />3 <br />3 <br />SPARES <br />6 <br />1 6 1 <br />3 <br />1 3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />TOTAL #14 <br />69 <br />1 69 1 <br />42 <br />1 32 <br />25 <br />20 <br />13 <br />23 <br />13 <br />12 <br />6 <br />SERVICE <br />3 <br />#8 <br />LUMINAIRE <br />4 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />SIGNAL COMMON <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />02 SAMPLER <br />2 <br />2 <br />2 <br />2 <br />DLC <br />06 SAMPLER <br />VIDEO <br />CAMERA ETHERNET CABLE <br />4 <br />4 <br />3 <br />2 <br />2 <br />1 <br />1 <br />1 <br />EVP <br />CABLE <br />4 <br />4 <br />3 <br />2 <br />2 <br />1 <br />1 <br />1 <br />EVP <br />CABLE GPS <br />1 <br />1 <br />1 <br />APS <br />CABLE <br />2 <br />2 <br />2 <br />2 <br />PTZ <br />CAMERA POWER CABLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />PTZ <br />CAMERA ETHERNET CABLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />CONDUIT SIZE <br />2-4" <br />4" <br />4" <br />4" <br />3" <br />3" <br />3" <br />3" <br />3" <br />PERCENT FILL <br />12% <br />23% <br />16% <br />11% <br />14% <br />11% <br />9% <br />14% <br />11% <br />- INTERSECTION SHALL BE WIRED FOR 8 VEHICLE PHASES AND 4 PED PHASES. <br />- APS CABLE SHALL BE BELDON #28326A BETWEEN BUTTON AND PED HEAD. <br />N) <br />405' T <br />2A LIMIT LINE <br />R <br />POLE LOCATION TABLE <br />LOCATION <br />DIM. A <br />DIM. B <br />O <br />24.5' <br />5.0' <br />© <br />24.5' <br />10.5' <br />© <br />23.0' <br />10.0' <br />O <br />29.0' <br />6.0' <br />O <br />22.0' <br />6.0' <br />O <br />22.0' <br />11.0' <br />© <br />20.5' <br />9.5' <br />O <br />28.0 <br />10.5' <br />- POLE LOCATIONS SHALL BE APPROVED <br />BY THE ENGINEER PRIOR TO DRILLING <br />FOUNDATIONS. <br />- DIMENSIONS ARE TO CENTER OF POLE. <br />- REFER TO SIGNAL STANDARD PLACEMENT <br />DETAIL, SHEET TS -3. <br />3"C, SCH 80 PVC), <br />MU APE <br />6E <br />C3 -- <br />n <br />05 <br />06P <br />06 <br />MAST ARM <br />02 <br />02 <br />03 <br />PROPOSED PHASE DIAGRAM <br />EVP ASSIGNMENT <br />EVA=02,05 <br />EVC=06 <br />EVD=03 <br />POLE AND EQUIPMENT SCHEDULE <br />POLE <br />MAST ARM <br />LUMINAIRE <br />z <br />REMARKS <br />(n <br />REFER TO SPECIAL PROVISIONS. <br />6FINSTALL GPS EVP CABLE TO PULL BOX. COIL AND LABEL 40' OF CABLE IN PULL BOX FOR FUTURE USE. <br />FOR <br />LOC <br />TYPE <br />O <br />SIG <br />n 20, <br />15 <br />PHASE SECTION VEHICLE PED PPB <br />1 38 3A <br />U <br />29-5-100 <br />30' <br />55' <br />15' <br />107W LED <br />LLJ <br />12 <br />MAS <br />~ <br />(n <br />2"C,316(SIGNALS) <br />QTS.> <br />(j) <br />3j14(LPEu) <br />> <br />LLI <br />GRADE. <br />LL1 <br />C� <br />3 2"C,3#2 <br />Q <br />FEET. <br />1 <br />© <br />Q <br />POLE AND EQUIPMENT SCHEDULE <br />POLE <br />MAST ARM <br />LUMINAIRE <br />SIGNAL MOUNTING <br />REMARKS <br />CABLE IN CABINET WITH UU WALL MOUNT BOX, <br />REFER TO SPECIAL PROVISIONS. <br />6FINSTALL GPS EVP CABLE TO PULL BOX. COIL AND LABEL 40' OF CABLE IN PULL BOX FOR FUTURE USE. <br />FOR <br />LOC <br />TYPE <br />IHGT <br />SIG <br />LUM <br />15 <br />PHASE SECTION VEHICLE PED PPB <br />CABLES, FIELD AND CENTRAL MANAGED ETHERNET SWITCH AND ASSOCIATED EQUIPMENT. CONTACT CITY TRAFFIC ENGINEERING <br />"D" <br />O <br />29-5-100 <br />30' <br />55' <br />15' <br />107W LED <br />06 <br />12 <br />MAS <br />06P <br />c° <br />INSTALL D3 'Tidewater Crossing" SIGN, PEU. <br />17 <br />PLACE <br />POLE <br />FOR <br />ULTIMATE <br />GRADE. <br />06 <br />06 <br />12 <br />12' <br />MAS <br />SV -1-T <br />SP -1 -T <br />FEET. <br />INSTALL R3-18 SIGN. ❑4 © 1p <br />© <br />1-B <br />10' <br />0 <br />°O <br />° <br />j <br />06 <br />CAP TOP OF POLE. <br />18 <br />PLACE <br />POLE <br />FOR <br />ULTIMATE <br />GRADE. <br />FUTURE <br />FINISH <br />SIDEWALK = <br />24.3 <br />RIGHT <br />In <br />© <br />26-4-100 <br />30' <br />45' <br />15' <br />107W LED <br />FUTURE <br />FINISH <br />SIDEWALK = <br />24.8 <br />06 <br />INSTALL "Airport Way" SIGN. 10 <br />LEFT <br />O1-13 <br />10' <br />05 <br />6 <br />A <br />12" <br />N -2-T <br />SP 1 T <br />05 <br />A <br />MAS <br />INSTALL R73-3(CA) SIGN AND D3 <br />O <br />29-5-100 <br />30' <br />55' <br />15 <br />02 <br />02 <br />12" <br />12" <br />MAS <br />MAS <br />Tidewater Crossing" SIGN. <br />02 <br />12" <br />1 SV -1-T <br />INSTALL R9-3 SIGN ON POLE. ❑4 ® 75 16 <br />O1-8 <br />10' <br />03 <br />A <br />TV- 1-T <br />17 <br />©26-4-100 <br />30' <br />45' <br />15' <br />107W LED <br />03 <br />03 <br />12" <br />12" <br />MAS -4B <br />INSTALL R3-4 SIGN AND D3 <br />Airport Way" SIGN. <br />SV -1-T <br />H <br />1-B <br />10' <br />02 <br />12" <br />N -1-T <br />INSTALL R9-3 SIGN ON POLE. 19 <br />- ALL PEDESTRIAN INDICATIONS SHALL BE INTERNATIONAL SYMBOLS, COUNTDOWN TYPE. <br />- PEDESTRIAN PUSH BUTTONS SHALL MEET ADA ACCESSIBILITY GUIDELINES (SEE SPECIAL PROVISIONS) <br />AND SHALL INCLUDE CUES VIA BOTH VIBRATING TACTILE ARROW AND AUDIBLE MESSAGE. <br />- REFER TO CITY STANDARD DRAWING R94 FOR STREET NAME SIGN ASSEMBLY AND MOUNTING. <br />- A: INDICATES ALL 12" ARROW HEAD <br />- ALL VEHICLE AND PEDESTRIAN INDICATIONS SHALL BE INTERNALLY FUSED L.E.D. MODULES. <br />- LUMINAIRES SHALL BE LEOTEK 107W WITH PHOTOCELL RECEPTACLE, <br />MODEL GCM2 40H MV NW 3R GY 850 PCR7 WL BBL <br />6 9 O - - - - - - - - - . <br />13 2 3C <br />t a' D3 6PPB <br />t— —� <br />B <br />06PPB / 10 10 <br />3"C,(SCH 80 PJC) //atl \\ 06P O <br />R P O R T W q Y 24 -STRAND SMFO �YK„ <br />MULETAPE 6E <br />j 06P _ <br />1 <br />3 3"C,(SCH BO PVC) <br />24 -STRAND SMFO, <br />R D3 06 MULETAPE <br />63' <br />2"C--" I <br />I <br />:>is, <br />T <br />12'VR $EV -C <br />R3-18 <br />FUTURE F.C. _ 1 <br />FUTURE LEFT <br />LANE LOCATION 58 <br />5A <br />2B 12C <br />I <br />CONSTRUCTION NOTES (THIS SHEET ONLY): 6 <br />1❑ COORDINATE WITH PG&E FOR SERVICE INSTALLATION. INSTALL 3"C, 3#2 FROM SERVICE POINT TO NEW SERVICE CABINET. 02 <br />CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH SERVICE INSTALLATION. CONTACT PG&E TO CONFIRM <br />SERVICE POINT AND COORDINATE INSPECTION AND CONNECTION HOOK-UP. PG&E WILL MAKE CONNECTION. 12 <br />2] FURNISH AND INSTALL SIEMENS TYPE M60 NEMA SIGNAL CONTROLLER WITH AUXILIARY EQUIPMENT HOUSED IN A TYPE P TS -2 TYPE 2 CABINET MOUNTED ON H <br />CONCRETE BASE 18" ABOVE SIDEWALK GRADE. CONTROLLER & CABINET SHALL INCLUDE ALL EQUIPMENT NECESSARY TO OPERATE THESE PLANS IN COMPATIBILITY 19 RO <br />WITH THE CITY OF STOCKTON TRAFFIC SIGNAL MASTER SYSTEM. CONTROLLER CABINET SHALL INCLUDE CITY STANDARD NETWORKING ETHERNET MANAGED SWITCH (ONE <br />FOR FIELD AND ONE FOR TMC) AND ALL ASSOCIATED EQUIPMENT PER THE SPECIAL PROVISIONS. CABINET SHALL INCLUDE A DUAL USE 4 -CHANNEL PRIORITY CONTROL <br />SYSTEM PHASE SELECTOR AND AUXILIARY PANEL WITH ALL WIRING AND ASSOCIATED EQUIPMENT PER MANUAFACTURER REQUIREMENTS FOR PRE-EMPTION ACTIVATION. <br />CONTROLLER CABINET DOOR SHALL OPEN TO THE STREET. REFER TO FOUNDATION DETAILS A AND E, SHEET TS -2. <br />FURNISH AND INSTALL TYPE III -AF ELECTRICAL SERVICE ON BASE. REFER TO DETAILS, SHEET TS -2. INSTALL PEU IN CABINET. REFER TO SPECIAL PROVISIONS FOR j <br />INSTALLATION OF BACK-UP PEU ON POLE <br />® INSTALL OPTICAL DETECTOR ON MAST ARM PER DETAIL "H SHEET TS -2. <br />❑5 FURNISH AND INSTALL VIDEO DETECTION CAMERA ON SIGNAL MAST ARM, VANTAGE RZ4 COLOR CAMERA WITH NEXT PROCESSOR <br />06 <br />06 <br />3"C,(SCH 80 PVC), <br />MULETAPE <br />_05 _ <br />2"C,2DLC ---I <br />05 111 <br />R73-3 <br />15' <br />f;V <br />02 <br />02R 1 <br />02 <br />(4 -SECTION) 03 <br />03 03 <br />7 <br />7 10 o a <br />O <br />D3 V <br />_ H — <br />15'4— <br />© 6 5 /o� - 6 12 17' <br />12 \\- FUTURE F.C., TYP. <br />FUTURE S NPING, TYP. <br />AND SMARTCYCLE TECHNOLOGY AS MANUFACTURED BY ITERIS OR APPROVED EQUAL. INSTALLATION SHALL INCLUDE ALL MOUNTING <br />13 <br />INSTALL 24 STRAND SMFO BRANCH CABLE IN 2 <br />1/2"C (SCH 80 PVC). TERMINATE FIBER <br />HARDWARE, CABLES AND ASSOCIATED EQUIPMENT. PROGRAMING SHALL BE BY FACTORY AUTHORIZED TECHNICIAN. <br />CABLE IN CABINET WITH UU WALL MOUNT BOX, <br />REFER TO SPECIAL PROVISIONS. <br />6FINSTALL GPS EVP CABLE TO PULL BOX. COIL AND LABEL 40' OF CABLE IN PULL BOX FOR FUTURE USE. <br />FOR <br />14 <br />COIL 60 FEET OF SLACK CABLE IN PULL BOX. <br />FUTURE <br />-1 FURNISH AND INSTALL ONE PTZ CAMERA ON LUMINAIRE ARM. INSTALLATION SHALL INCLUDE ALL MOUNTING HARDWARE, VIDEO, <br />DATA AND POWER <br />15 <br />TYPE 29-5-100 POLE TO BE INSTALLED TO ACCOMMODATE FUTURE 15' LUMINAIRE ARM. <br />CABLES, FIELD AND CENTRAL MANAGED ETHERNET SWITCH AND ASSOCIATED EQUIPMENT. CONTACT CITY TRAFFIC ENGINEERING <br />"D" <br />(209-937-8411) PRIOR <br />LUMINAIRE ARM TO BE INSTALLED WITH FUTURE <br />EAST SIDE IMPROVEMENTS AND RELOCATION <br />TO CAMERA INSTALLATION. REFER TO SPECIAL PROVISIONS AND DETAIL SHEET TS -2 FOR EQUIPMENT SPECIFICATIONS AND <br />MOUNTING DETAILS. <br />° <br />n FURNISH AND INSTALL VIDEO DETECTION CAMERA ON SIGNAL MAST ARM, VECTOR VIDEO/RADAR HYBRID UNIT AS MANUFACTURED BY ITERIS <br />OR APPROVED EQUAL. INSTALLATION SHALL INCLUDE ALL MOUNTING HARDWARE, CABLES AND ASSOCIATED EQUIPMENT. PROGRAMING SHALL BE <br />BY FACTORY AUTHORIZED TECHNICIAN. <br />F9 INSTALL EVP AND DETECTION CAMERA CABLES TO PULL BOX. COIL AND LABEL <br />100' OF EACH CABLE IN PULL BOX FOR FUTURE USE. <br />1p PROVIDE TENON FOR FUTURE USE, CAP TENON. <br />71 INSTALL SPLICE ENCLOSURE AND SPLICE 24 STRAND TRUNK WITH 24 STRAND BRANCH CABLE. REFER TO FIBER SPLICE DIAGRAM SHEET TS -3. <br />PROVIDE 30' OF SLACK CABLE ON EACH SIDE OF SPLICE. <br />12 PULL BOX IN NATIVE SOIL SHALL HAVE A 12" CONCRETE COLLAR, 6" DEEP. <br />6E <br />�2"C, PULL TAPE <br />3"C,(SCH 80 PVC) <br />24 -STRAND SMFO, <br />MULETAPE <br />FUTURE F.r. <br />PJC1 <br />� 24 -STRAND S F0, <br />2D] MULETAPE <br />Typ <br />O R9-3 <br />2"CPULL TAPE� <br />(55 MP 4 p5 STO) R <br />LIMIT LINE 6A <br />R <br />1 <br />�3"C,(SCH 80 PVC1 <br />24 -STRAND S F01 <br />MULETAPE, L=380 <br />DO <br />+ ^ <br />N () <br />Q <br />W <br />W Ld <br />Z = <br />J <br />= W <br />U LLJ <br />F- <br />u <br />Q <br />NOTE: <br />THESE PLANS ARE SUBJECT TO THE SPECIAL <br />PROVISIONS FOR TRAFFIC SIGNALS AND SAFETY <br />LIGHTING INSTALLATION AT THE AIRPORT WAY / <br />TIDEWATER CROSSING INTERSECTION. <br />THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY <br />z <br />OF EXISTING <br />OVERHEAD PG&E POWER LINE <br />CONSTRAINTS. <br />i6 <br />PLACE <br />POLE <br />FOR <br />ULTIMATE <br />GRADE. <br />FUTURE <br />FINISH <br />SIDEWALK <br />= 24.5 <br />FEET. <br />N <br />c <br />rn <br />° <br />c° <br />17 <br />PLACE <br />POLE <br />FOR <br />ULTIMATE <br />GRADE. <br />FUTURE <br />FINISH <br />SIDEWALK <br />= 24.2 <br />FEET. <br />w <br />0 <br />°O <br />° <br />j <br />n <br />18 <br />PLACE <br />POLE <br />FOR <br />ULTIMATE <br />GRADE. <br />FUTURE <br />FINISH <br />SIDEWALK = <br />24.3 <br />FEET. <br />In <br />79 <br />PLACE <br />POLE <br />FOR <br />ULTIMATE <br />GRADE. <br />FUTURE <br />FINISH <br />SIDEWALK = <br />24.8 <br />FEET. <br />THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY <br />z <br />1n <br />S <br />a <br />Q. <br />0 <br />C -D <br />U5 <br />C/) <br />0f <br />U <br />0f <br />W <br />Q <br />W <br />F -- <br />Q <br />O <br />AIRPORT WAY / TIDEWATER CROSSING <br />a <br />F INTERIM TRAFFIC SIGNAL PLAN <br />DEPARTMENT OF PUBLIC WORKS <br />CITY OF STOCKTON, CALIFORNIA <br />SCALE: 1"=20' APPROVED BY:SHEET N0. <br />i DESIGNED BY: MB T S -1 <br />DRAIN BY., MB <br />16 OF 21 <br />RECORD DWG: <br />S41�Z.�5 L <br />u: <br />ul <br />� � <br />c <br />rn <br />° <br />c° <br />w <br />°- <br />ae 0 <br />If) <br />o <br />w <br />0 <br />°O <br />° <br />j <br />0 <br />n <br />~Nc�o <br />n <br />c <br />In <br />�J <br />- <br />rn <br />1n <br />S <br />a <br />Q. <br />0 <br />C -D <br />U5 <br />C/) <br />0f <br />U <br />0f <br />W <br />Q <br />W <br />F -- <br />Q <br />O <br />AIRPORT WAY / TIDEWATER CROSSING <br />a <br />F INTERIM TRAFFIC SIGNAL PLAN <br />DEPARTMENT OF PUBLIC WORKS <br />CITY OF STOCKTON, CALIFORNIA <br />SCALE: 1"=20' APPROVED BY:SHEET N0. <br />i DESIGNED BY: MB T S -1 <br />DRAIN BY., MB <br />16 OF 21 <br />RECORD DWG: <br />S41�Z.�5 L <br />
The URL can be used to link to this page
Your browser does not support the video tag.