Laserfiche WebLink
■ :51MART754M <br />Cn <br />EP <br />EPJ <br />—0.17' HMA Overlay------------- <br />41 <br />verlay----- ----- <br />•`LS <br />q Const <br />M <br />o'I <br />oo_: <br />Izl <br />v, <br />o <br />i6 <br />a <br />l <br />O <br />o <br />J41 <br />140 <br />SIXR <br />V) <br />Q <br />o <br />Ln <br />0.17' <br />� 7 <br />O� <br />v <br />Existing <br />II � �0 <br />!SD; <br />� <br />I I <br />i <br />I , <br />I , <br />M <br />-Ln <br />R <br />EP <br />EPJ <br />—0.17' HMA Overlay------------- <br />41 <br />verlay----- ----- <br />•`LS <br />q Const <br />M <br />a <br />EP <br />-0.17' HMA Overlay - <br />0.0- <br />HICKORY AVENUE <br />12 <br />q Const <br />RECORD DRAWI11 C3 <br />Corrections By <br />tufo Changes <br />Any Person Using This Drawing Shou►d Verity <br />All IrMormation By Inspecting The Site Of Work <br />Q <br />Y p,VENVE `. <br />CKOR 25 <br />Existing Trees <br />to remain in place <br />Limits of Remove Subbase, Base, and Road Surfacing <br />Depth of Remove Subbase, Base, and Roadway Surfacing <br />Existing Storm Drain Maintenance Hole to protect and remain in place <br />Remove 0.25' Subbase, Base and Roadway Surfacing <br />Existing Storm Drain Maintenance Hole to be adjusted <br />4- <br />Q) <br />J <br />E <br />0 <br />13 � o <br />m <br />Q <br />___-0.17' HMA Overlay--- - -- <br />7-25' <br />7'25' <br />i <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Andres Andrade 9/23 11/20/23 <br />NO SCALE I PLAN <br />CHECKED DATE <br />11/20/23 <br />!�,»> END PROJECT <br />Q. HICKORY AVENUE <br />MORADA AREA STREETS RESURFACING 20241 Sheet No. <br />3 of 8 <br />LEGEND: <br />O <br />Adjust or <br />Replace Monument Frame and Cover <br />a <br />W;; <br />Existing <br />Water Valve to remain in place <br />0.17' <br />� 7 <br />Existing <br />SDI to remain in place <br />!SD; <br />� <br />M <br />R <br />Conform <br />to Existing Radii <br />z <br />P <br />Existing <br />water valve to be adjusted <br />a <br />EP <br />-0.17' HMA Overlay - <br />0.0- <br />HICKORY AVENUE <br />12 <br />q Const <br />RECORD DRAWI11 C3 <br />Corrections By <br />tufo Changes <br />Any Person Using This Drawing Shou►d Verity <br />All IrMormation By Inspecting The Site Of Work <br />Q <br />Y p,VENVE `. <br />CKOR 25 <br />Existing Trees <br />to remain in place <br />Limits of Remove Subbase, Base, and Road Surfacing <br />Depth of Remove Subbase, Base, and Roadway Surfacing <br />Existing Storm Drain Maintenance Hole to protect and remain in place <br />Remove 0.25' Subbase, Base and Roadway Surfacing <br />Existing Storm Drain Maintenance Hole to be adjusted <br />4- <br />Q) <br />J <br />E <br />0 <br />13 � o <br />m <br />Q <br />___-0.17' HMA Overlay--- - -- <br />7-25' <br />7'25' <br />i <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Andres Andrade 9/23 11/20/23 <br />NO SCALE I PLAN <br />CHECKED DATE <br />11/20/23 <br />!�,»> END PROJECT <br />Q. HICKORY AVENUE <br />MORADA AREA STREETS RESURFACING 20241 Sheet No. <br />3 of 8 <br />