Laserfiche WebLink
Remove 0.25' Subbase, Base, and Roadway Surfacing- Remove 0.25' Subbase, Base, and Roadway Surfacing <br />Place 0.25' HMA Place 0.25' HMA <br />See Below Left <br />Existing Curb and Gutter to remain in place, <br />Iunless otherwise noted in the plans (Typ) <br />I 'IEP - <br />I w �. Const <br />Iz� �_--- - -_ --- <br />Q �I MADELINE DRIVE LO <br />Q1�0 11 12-4 <br />I< P <br />0 EP <br />BEGIN PROJECT <br />EP <br />0 - A -- --- -- \� - <br />MADELINE DRIVE <br />17 <br />45 <br />EP <br />Remove 0.25' existing natural ground and place 0.25' HMA. <br />I I I Paid for by Remove Subbase, Base and Roadway Surfacing item of work. <br />i& <br />(i const <br />O <br />F— <br />W <br />0 > <br />ryry <br />mo <br />sa, <br />STA 18+21 Madeline Drive= <br />STA 18+21 Broughton Drive <br />I <br />-- -_ --_ I -Remove 0.25' Subbase, Base, and <br />Roadway Surfacing--- <br />-- - - - _ -_ <br />-_Remove 0.25' Subbase, Base, and Roadway Surfacing --/L— <br />Place 0.25' HMA <br />0 i <br />Place HMA 0.25' <br />Remove and Dispose--�, <br />-Remove <br />Plate ', <br />Ln r-; <br />'n <br />Const + <br />oMetal <br />O Sta 25+00 Broughton Drive- <br />+EP <br />+ <br />0,C) <br />6 (Typ) <br />EP-..iSta 25+00 Springfield Way <br />BROUGHTON <br />DRIVE. <br />0 <br />' � 20 <br />21 <br />22 ,� Ir � <br />23 eR <br />S/24Q � <br />y SON <br />0)��� 0)-, <br />L (7 00 <br />W wi <br />—1 (sd <br />- EP <br />Const <br />Q <br />D <br />M <br />M <br />M NOTE: For a complete list of Adjust/Replace Monument, <br />o Storm Drain Maintenance Hole, and Water Valve locations, <br />see Summary of Quantities on Sheet 8. <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Andres Andrade 9V23 11/20/23 <br />Broughton Drive: Sta 23+20 to Sta 23+34 <br />Existing utility vault and 3 water valves ; <br />C r eanremain in place Broughton Drive: Sta 23+30 to Sta 26+41 - <br />RGCOR INU Remove 0.25' Subbase, Base, and Roadway <br />Co 8�0< and place 0.25' HMA' up to hinge line. <br />No Chwq" � <br />Any Peram Using This Drawing S ,ouid Verify <br />411 information Rw inArw r_tinn Thw-. nr w...L <br />NO SCALE I PLAN <br />CHECKED DATE <br />g�� 11 /20/23 <br />-(. 1 <br />rri <br />15' 15' <br />- <br />See Sheet No.5 <br />MORADA AREA STREETS RESURFACING 2024 <br />Sheet No. <br />4 of 8 <br />0 i <br />-Remove <br />i <br />and Replace existing <br />Curb, Gutter and Saw Cut <br />Driveway. <br />See detail on Sheet <br />6 (Typ) <br />AA�a1% <br />Q <br />D <br />M <br />M <br />M NOTE: For a complete list of Adjust/Replace Monument, <br />o Storm Drain Maintenance Hole, and Water Valve locations, <br />see Summary of Quantities on Sheet 8. <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Andres Andrade 9V23 11/20/23 <br />Broughton Drive: Sta 23+20 to Sta 23+34 <br />Existing utility vault and 3 water valves ; <br />C r eanremain in place Broughton Drive: Sta 23+30 to Sta 26+41 - <br />RGCOR INU Remove 0.25' Subbase, Base, and Roadway <br />Co 8�0< and place 0.25' HMA' up to hinge line. <br />No Chwq" � <br />Any Peram Using This Drawing S ,ouid Verify <br />411 information Rw inArw r_tinn Thw-. nr w...L <br />NO SCALE I PLAN <br />CHECKED DATE <br />g�� 11 /20/23 <br />-(. 1 <br />rri <br />15' 15' <br />- <br />See Sheet No.5 <br />MORADA AREA STREETS RESURFACING 2024 <br />Sheet No. <br />4 of 8 <br />