My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7775 - SP7782
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP7508 -
>
SP7775 - SP7782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 10:19:52 AM
Creation date
5/14/2024 10:27:09 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Morada Area Streets Resurfacing 2024
Limits
Broughton Drive: Springfield Way to Madeline Drive; Camden Court: West End to Springfield Way; Hickory Avenue: Morada Lane to Northeast End; Madeline Lane: Morada Lane to Broughton Drive; West End to Plum Avenue; Springfield Way: Broughton Drive to Ashley Lane Morada Lane: CCTC Railroad to Michelle Lane
Year
2023
Project Engineer
Ger Lee
Roads Worked
Broughton Dr., Camden Ct., Hickory Ave., Madeline Ln.
Springfield Wy., Morada Ln.
Red Lines
Yes
Project #
222313
Districts
District 4
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7775 - SP7782
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
m <br />Iz <br />0 <br />z ;n <br />9 <br />-E <br />(n <br />Q) <br />0 <br />V) <br />Remove 0.25' Subbase, Base, and Roadway Surfacin <br />Place 0.25' HMA <br />II 3 II <br />I � I <br />OI <br />I Const <br />w <br />EP- jjU%� <br />SPRINGFIELD WAY _ <br />30 <br />00 <br />N Lo <br />O + <br />E0 <br />o ° <br />cU) <br />0 <br />RECORD DRAWING <br />cffm coons sy - -�L 'w <br />NoChwWo113y; ._� ...... �.� <br />Oats <br />Any Pwoon Using Thls DravAng Should Verify <br />AN Infor n ition Sy Inspecting The Site Of Work <br />Remove 0.25' Subbase, Base, And Roadway Surfacing <br />Place 0.25' HMA <br />See Below <br />16' 15' <br />W F- <br />o� <br />Q O <br />U U <br />ro Const <br />JR R <br />E P <br />SPRINGFIELD WAY <br />31 31 35 <br />o : in <br />EP- <br />-Sta 34+04 Springfield Way= <br />Sta 13+59 Camden Court <br />Remove 0.25' Subbase, Base, and Roadway Surfacing <br />P4oce 0.25' HMA <br />�ket- 0 o'VW V-toft c�•w. tt �� <br />Const1 ( Ux. cx'b % <br />® � W o EP <br />COUNTY OF SAN JOAQUIN <br />NO SCALE <br />En <br />DRAWN BY <br />DATE <br />PROJECT ENGINEER <br />DATE <br />CHECKED <br />Andres Andrade <br />9/23 <br />1-1/20/23 <br />CAMDEN COURT <br />11 <br />I <br />EP <br />PLAN <br />DATE <br />11/20/23 <br />12 <br />L01 <br />04 <br />00 1_ Z <br />En <br />I <br />00 <br />c:I�V <br />I <br />I <br />0000 W <br />Z <br />_I <br />t �I <br />=i <br />U Q <br />I <br />� I <br />I <br />- I <br />I <br />END PROJECT <br />MORADA AREA STREETS RESURFACING 2024 I sheet No. <br />5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.