Laserfiche WebLink
5 <br />BPECIFICAnQNS: <br />1. ALL IMPROVEMENTS SHALL BE DONE IN ACCORDANCE WITH THE <br />REQUIREMENTS OF THE COUNTY OF SAN JOAQUIN IMPROVEMENT <br />SPECIFICATIONS AND STANDARDS, AND THE LATEST EDITION OF THE <br />STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION, DIVISION OF <br />HIGHWAYS STANDARD SPECIFICATIONS. <br />2. WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF <br />WOOK IN GENERAL TERMS BUT NOT IN COMPLETE DETAIL, IT IS <br />UNDERSTOOD THAT ONLY THE BEST GENERAL PRACTICE IS TO PREVAIL <br />AND THAT ONLY MATERIALS AND WORKMANSHIP OF THE FIRST QUALITY <br />ARE TO BE USED. <br />3.LINES AND GRADES: ALL DISTANCES AND MEASUREMENTS ARE GIVEN <br />AND WILL BE MADE IN A HORIZONTAL PLANE. GRADES ARE GIVEN FROM <br />THE TOP OF STAKES OR NAILS, UNLESS OTHERWISE NOTED. THE <br />CONTRACTOR SHALL PRESERVE ALL STAKES AND POINTS SET FOR <br />LINES, GRADES OR MEASUREMENTS OF THE WORK IN THEIR PROPER <br />PLACES UNTIL AUTHORIZED TO REMOVE THEM BY THE ENGINEER. ALL <br />EXPENSES INCURRED IN REPLACING STAKES THAT HAVE BEEN REMOVED <br />WITHOUT PROPER AUTHORITY SHALL BE PAID FOR BY THE GENERAL <br />CONTRACTOR. <br />4. ALL MANHOLE, LAMPHOLE AND WATER VALVE CASTINGS AND <br />COVERS SHALL BE ADJUSTED TO FINISH GRADE BY THE PAVING <br />CONTRACTOR AFTER STREET IMPROVEMENTS ARE COMPLETED. <br />5. QQMPACTIQN TESTS: CONTRACTOR TO PROVIDE COMPACTION TESTS <br />IN STREETS AS REQUIRED BY SAN JOAQUIN COUNTY, AT THE <br />CQ�TRACTOR'S EXPENSE <br />6. • APPROPRIATE DUST CONTROL TO BE PROVIDED FOR <br />TH ALLEVIATION OR PREVENTION OF DUST NUISANCE, AT TH1IR6QTOR'S EXPENSE <br />7. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE AND <br />FEDERAL SAFETY REGULATIONS PERTAINING TO HIS OPERATIONS. HE <br />SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAGMEN OR OTHER <br />DEVICES NECESSARY FOR PUBLIC SAFETY. THE CONTRACTOR'S <br />ATtENTION IS CALLED TO THE REQUIREMENTS OF TITLE 8, CALIFORNIA <br />ADMINISTRATIVE CODE, SUBCHAPTER 4, ARTICLE 6, "EXCAVATIONS, <br />TRENCHES, EARTHWORK." SEE ALSO SECTION 5 OF SAN JOAQUIN <br />COUNTY STANDARDS. <br />8. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE <br />RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF <br />CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS <br />AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY <br />AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE <br />CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND <br />THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR <br />ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THE <br />PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE <br />NEGLIGENCE OF THE OWNER OR THE ENGINEER. <br />9. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE <br />RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSE OF <br />CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS <br />AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY <br />AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE <br />CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS, THE <br />COUNTY OF SAN JOAQUIN, ITS ELECTED OFFICIALS, OFFICERS, <br />EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS, COSTS OF <br />LITIGATION, DAMAGES, AND ATTORNEY'S FEES, FOR PERSONAL INJURY <br />OR PROPERTY DAMAGE OF WHATEVER NATURE WHICH ARE CLAIMED TO <br />HAVE OCCURRED DURING THE TERM OF THIS PROJECT. <br />EROSION CONTROL „ NOTES: <br />1. ALL DRAIN INLETS SHALL HAVE EROSION CONTROL <br />PER DETAILS EC-1 & EC-2. <br />2. THE: CONTRACTOR SHALL COMPLY WITH THE <br />REQUIREMENTS OF THE STATE WATER RESOURCES <br />CONTROL BOARD, ORDER NO. 92-06-DWQ, NPDES <br />GENERAL PERMIT NO. CAS000002. THE CONTRACTOR <br />SHALL DEVELOP, IMPLEMENT, AND MONITOR A STORM <br />WATER POLLUTION PREVENTION PLAN (SWPPP) IN <br />ACCORDANCE WITH THE ABOVE PERMIT. <br />TRAUIC CONTROL, <br />1. ALL TRAFFIC SIGNS, MARKING, AND STRIPING SHALL CONFORM <br />TO THE "MANUAL OF UNIFORM CONTROL DEVICES AND SAN <br />JOAQUIN COUNTY STANDARDS" AND AS SHOWN ON THESE <br />PLANS. <br />2. A MINIMUM OF ONE 10' TRAFFIC LANE SHALL BE MAINTAINED <br />AT ALL TIMES, WITH TRAFFIC DELAYS LIMITED TO A MAXIMUM OF <br />15 MINUTES. A MINIMUM OF TWO 10' TRAFFIC LANES SHALL BE <br />MAINTAINED DURING NON -WORKING HOURS. TRAFFIC CONTROLS <br />SHALL BE IN ACCORDANCE WITH SECTION 12 OF THE CALTRANS <br />STANDARD SPECIFICATIONS. <br />CV <br />U <br />f <br />i <br />REVISION DATE <br />DESCRIPTION <br />GENERAL NOTES: <br />1. A PERMIT SHALL BE OBTAINED FROM SAN JOAQUIN COUNTY BEFORE <br />BEGINNING WORK IN MOSHER SLOUGH. A PERMIT SHALL BE OBTAINED <br />FROM THE SAN JOAQUIN COUNTY HEALTH DEPARTMENT PRIOR TO <br />CONSTRUCTION OF WELLS AND PRIOR TO THE DESTRUCTION OF THE <br />ABANDONED WELLS ONSITE, <br />2. CONTRACTOR SHALL LOCATE AND PRESERVE ALL FACILITIES INCLUDING <br />GAS, WATER, IRRIGATION, SEWER, POWER, STREET LIGHTS, TELEPHONE AND <br />OTHERS WHICH MAY BE iN THE AREA OF CONSTRUCTION. RESPECTIVE <br />UTILITY COMPANIES SHALL BE NOTIFIED PRIOR TO COMMENCEMENT OF <br />WORK. <br />3. A 10 FOOT PUBLIC UTILITY EASEMENT IS TO BE PROVIDED ALONG ALL <br />STREET FRONTAGES. <br />4. P.G. & E. AND PACIFIC BELL FACILITIES ARE TO BE INSTALLED BY THE <br />RESPECTIVE UTILITY COMPANIES AND ARE TO OCCUPY A JOINT TRENCH IN <br />THE 10 FOOT PUBLIC UTILITY EASEMENT. <br />5. WATER MAINS AND SERVICES ARE TO BE INSTALLED BY THE DEVELOPER <br />ACCORDING TO THE SAN JOAQUIN COUNTY IMPROVEMENT STANDARDS FOR <br />PUBLIC WORKS, CHAPTER 4. <br />6. SET BACKS ARE AS REQUIRED BY ORDINANCE OR DEED RESTRICTIONS. <br />7. THE CONTRACTOR SHALL OBTAIN A PERMIT FROM THE SAN JOAQUIN <br />BUILDING DEPARTMENT PRIOR TO PLACING FILL ON LOTS. <br />8. THE CONTRACTOR SHALL FURNISH AND INSTALL TRAFFIC CONTROL <br />SIGNS, STREET NAME SIGNS AND PAINTING IN ACCORDANCE WITH THE <br />COUNTY OF SAN JOAQUIN IMPROVEMENT SPECIFICATIONS AND STANDARDS, <br />AND THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION <br />MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. <br />9. CALL USA TOLL EREE 500-642-2BEFORE PLANTING TREES, <br />TRENCHING, DIGGING FENCE POST HOLES, BLASTING, GRADING, EXCAVATING, <br />DRILLING, PIPE PUSHING, ETC., CALL UNDERGROND SERVICE ALERT FOR <br />UNDERGROUND CLEARANCE. USA WILL PROVIDE INFORMATION ABOUT, OR <br />LOCATE AND MARK UNDERGROUND FACILITIES FOR YOU. <br />10. A TEST WELL WHICH SHOWS THAT THE PRODUCTION WELL WILL MEET <br />APPLICABLE STANDARDS IS REQUIRED PRIOIR TO THE APPROVAL OF THE <br />IMPROVEMENT PLANS OR ANY WORK WITHIN THE SITE. <br />11. A TRENCH SHORING PLAN SHALL BE SUBMITTED TO AND DEAMED <br />ACCEPTABLE BY COUNTY PRIOR TO THE START OF WORK. SHORING AND <br />PLATING WHICH IS SUBJECT TO PUBLIC TRAFFIC LOADINGS SHALL <br />BE DESIGNED AND CERTIFIED BY A CALIFORNIA LICENSED CIVIL ENGINEER. <br />12. DRAINAGE FACILITIES SHALL BE MAINTAINED DURING PERIODS OF <br />INCLEMENT WEATHER, AND RESTORED TO THEIR ORIGINAL CONDITION UPON <br />COMPLETION OF WORK. <br />13. WELL DRILLING AND DEVELOPMENT LOGS TO BE FURNISHED TO THE <br />COUNTY. <br />APPROVED DATE I COMPUTED: <br />MJB <br />DRAWN BY: RAE/RDF/RHK <br />DESIGN BY: SRB <br />PROJ. ENGR. S R R <br />TIE BINDINr'4Z <br />TOGEI <br />WITH <br />16" GA. <br />(1 <br />A <br />DROP <br />INLET <br />[WWOZ&AM <br />EC-1 <br />STRAW BALE INLET FILTER W/GUTTER NTS <br />BALES <br />Y TOGETHER <br />STRAW BALE <br />(TYP-) <br />r / <br />f <br />71. <br />RAW DROP^ <br />LE (TYP.} INLET <br />DTES: <br />BALES SHALL BE PLACED WITH BINDINGS IN A <br />HORIZONTAL POSITION. BALES SHALL BE TIGHTLY <br />BOUND TOGETHER USING A MIN. OF 16 GA. WIRE <br />TO TIE BINDINGS BETWEEN BALES. USE THE MIN. <br />NUMBER OF BALES THAT PROVIDE PERIMETER <br />COVERAGE WITHOUT COVERING ANY PORTION OF <br />THE GRATE INLETS. <br />CONTRACTOR SHALL MAKE PERIODIC INPECTIONS <br />TO DETERMINE IF REPAIRS OR SEDIMENT REMOVAL <br />IS REQUIRED. SEDIMENT SHALL BE REMOVED WHEN <br />IT EXTENDS BEYOND THE GUTTER ONTO THE <br />PAVEMENT. <br />3. BALES SHALL BE REPLACED WHEN THEY HAVE <br />BEEN DAMAGED, COLLAPSED OR DECOMPOSED. <br />FORCE BALES TIGHTLY <br />AGAINST CURB <br />R /W 50, R/W <br />I do 25' 25' <br />U U <br />9' 0 1 U-15' 15' �01' g <br />CALTRANS <br />2% MIN 6" TYPE A <br />"----.� AC DIKE 2y 2� MIN <br />�,x,, 2% <br />PRIME COAT (TYP.) ---J TI=4'0 "\0.20' AC <br />R-VALUE=10 <br />LO.60' AB SUBGRADE 95% <br />COMPACTION REQ. TYP.) <br />BLACK OAK RIY & SILVER C ASE DRIVE & EAST W DRIVE <br />0 <br />Li uo <br />Ell <br />PER STREET <br />SECTION <br />[inCELLA BARR <br />ASSOCIATES <br />ENGHUMIG. PIA 06 . LNVQSM MCMEC1 K . WATER RESOURCES . SURVEYING <br />777 CAMPUS COMMONS ROAD SUITE 200 SACRAMENTO, CA 95825 <br />PHONE (916) 565-7446 FAX (916) 565-7452 <br />AC DIKE wo. <br />TYPICAL SECTION <br />NTS <br />CALTRANS 6 " TYPE "A " <br />AC = <br />NTS <br />NOTE: <br />SEE CALTRANS STANDARD PLANS <br />FOR ANY ADDITIONAL NOTES & DETAILS <br />3 NO. C 047099 [ <br />EXP. 12/31 /99 <br />*Jp ClV l�- �'� <br />\FAFCALIFO� <br />R/W <br />MINIMUM OF TWO <br />2"x2" STAKES OR STAKE OR REBAR (TYP.) <br />#4 REBAR (TYP.) STRAW BALE 1" BELOW SURFACE <br />EACH BALE (TYP.} <br />FLOW I I I I <br />$" <br />DRIVE STAKES II II <br />TOWARDS D.I. <br />DROP 4' PLACE <br />INLET _ COMPACTED <br />DROP I SOIL <br />INLET <br />, 1 <br />t � k <br />A 0 MIN. SECTIQIS A -A SET BALE <br />A IN 4" DEEP <br />TRENCH <br />NOTE: <br />1. BALES SHALL BE PLACED TIGHTLY TOGETHER IN A <br />TRENCH EXCAVATED A MINIMUM OF 4" BELOW THE INLET. <br />2. EACH BALE SHALL BE ANCHORED BY A MINIMUM OF <br />TWO 2"x2" STAKES OR TWO #4 REBARS DRIVEN THROUGH <br />THE BALES AND INTO THE GROUND A MINIMUM DEPTH OF <br />ONE FOOT. TOPS OF STAKES OR REBAR SHALL BE COUNTER- <br />SUNK A MINIMUM OF 1" BELOW THE TOP OF THE BALE. <br />v 3. OUTER PERIMETER OF THE BALES SHALL BE BACKFILLED <br />STRAW BALE DRIVE STAKES PLACE AND COMPACTED TO A DEPTH OF APPROXIMATELY, 4" WITH <br />(TYP.) TOWARDS D.I. BALES EXCAVATED MATERIAL. <br />TIGHTLY <br />TOGETHER 4. CONTRACTOR SHALL MAKE PERIODIC INSPECTIONS TO <br />FLOW DETERMINE IF REPAIR OR SEDIMENT REMOVAL IS REQUIRED. <br />SEDIMENT SHALL BE REMOVED WHEN IT HAS BUILT UP TO <br />PLAN VIEW A DEPTH OF APPROXIMATELY 1 /2 OF THE BALE HEIGHT. <br />EC-- 2 5. BALES SHALL BE REPLACED WHEN THEY HAVE BEEN <br />DAMAGED, COLLAPSED DECOMPOSED. <br />STRAW BALE INLET FILTER NON GUTTER NTS <br />2• <br />R/W <br />12' <br />25' <br />U <br />1' u- 12' <br />.00 <br />50' R/W <br />25' <br />v <br />12' O 12' i• <br />r Mq --CALTRANS 6" r 1 �P <br />"r TYPE A AC DIKE <br />2% MIN <br />2% MIN F ." <br />PRIME COAT TI=4.0 0.2' AC <br />R-VALUE=10 <br />(�') 0.60' AB (95% COMPACTION REQUIRED TYP.) <br />SUBGRADE 95% COMPACTION REQ. TYP. <br />BLACK _OAK COURT & 12REYSTONE COURT <br />TYPICAL SECTION <br />NTS <br />NEW OVERLAY TO CREATE <br />UNIFORM CROSS SLOPE <br />30' <br />EXIST STREET IMPROVEMENTS <br />30' <br />20' <br />VARIES 0' TO VARIES 11' TO 20' <br />EXIST. PVM NEW PAVEMENT <br />1' <br />SAWCUT AND <br />MATCH TO EXIST <br />PVMT. 1' MIN, <br />FROM E.P. <br />2% MIN, <br />TI=5.0 GRIND EXIST PAVEMENT <br />R-VALUE=10 AT C TO CREATE <br />"FEATHERED" EDGE <br />QUAM ICI- ROAD <br />TYPICAL SECTION <br />N TS <br />IMPROVEMENT PLANS FOR <br />BLACK OAK ESTATES <br />NOTES &TYPICAL SECTIONS <br />COUNTY OF SAN JOAQUIN <br />R/W <br />4' 6' <br />GRADE DIFF. <br />1.5' MAX. <br />MAX <br />8� 1 <br />6" AB SHOULDER <br />COMPACTED 0 95% <br />PROPOS RELATIVE COMPACTION <br />DRAINAGE <br />SWALE <br />0.20' A.C. <br />0.85' A.B. <br />PRIME COAT <br />DATE: 10/28/1999 <br />SCALE: <br />2 <br />HORIZONTAL: NONE <br />OF_ <br />VERTICAL: NONE <br />26 <br />CADFILE: C2.DWG <br />CALIFORNIA <br />JOB NO: 530084.01 <br />PRINTED: THUR 10/28/1999 <br />15:01:52 <br />