Laserfiche WebLink
CCO32- Sheet 2of3 <br />GENERAL NOTES: McHenry Ave Corridor Improvement Project <br />1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST - �, ETHIS:SHEET ACCURATE FOR LIGHTING <br />CALTRANS STANDARD PLANS AND SPECIFICATIONS DATED 2010 AND AS BUILTSUBSEQUENT NEW AND REVISED STANDARD PLANS. Resident En ineer - Mauricio Rivera. P.E.EE ALSO SHEETS E-1, E-1 r1. <br />9 � <br />2. THE CONTRACTOR IS HEREBY NOTIFIED THAT PRIOR TO COMMENCING Revisions By !2�- _9/28/2021 o <br />CONSTRUCTION, HE IS RESPONSIBLE FOR CONTACTING ALL UTILITY 0 <br />COMPANIES FOR VERIFICATION AT THE CONSTRUCTION SITE OF THE <br />LOCATIONS OF ALL UNDERGROUND AND OVERHEAD FACILITIES WHERE \, __ <br />SUCH FACILITIES MAY CONFLICT WITH PLACEMENT OF IMPROVEMENTS 2 C, 2#10 <br />SHOWN ON THIS PLAN. CALL "UNDERGROUND SERVICE ALERT" AT - 6' x 10' <br />800-227-2600 48 HOURS PRIOR TO ANY EXCAVATION. , 6G <br />3. THE LOCATION OF ALL PULL BOXES, CONDUIT AND OTHER EQUIPMENT <br />SHOWN ON THIS PLAN ARE APPROXIMATE AND MAY BE CHANGED TO <br />SUIT FIELD CONDITIONS AS DIRECTED BY THE ENGINEER. <�o DH <br />4. THE CONTRACTOR SHALL CONTACT PG&E TO VERIFY OVERHEAD 13 - 2'C, 1 DLC, 2#10 <br />FACILITIES CLEARANCE REQUIREMENT PRIOR TO COMMENCING ANY 1 <br />CONSTRUCTION. <br />5. THE CONTRACTOR MUST MAINTAIN THE EXISTING FLASHING BEACON <br />SYSTEM IN OPERATION DURING THE STAGE CONSTRUCTION. <�° <br />CONTRACTOR MUST SUBMIT TEMPORARY ELECTRICAL PLANS TO R/W <br />COUNTY FOR APPROVAL PRIOR TO ANY STAGE CONSTRUCTION WORK. <br />DH]" ; <br />1 <br />PROJECT NOTES= H 04 <br />2 7 00 <br />FURNISH AND INSTALL MODEL 2070E CONTROLLER ASSEMBLY <br />WITH MODEL 332 CABINET AND BATTERY BACKUP SYSTEM AND R/W 9 9 <br />MCCAIN 2033 SOFTWARE OS-9 REAL-TIME OPERATING SYSTEM. V171 - DH <br />THE CONTRACTOR MUST SUBMIT "CERTIFICATES OF COMPLIANCE" 10 9 <br />04� <br />- A4 <br />I1 <br />G7-1(MCHenry Ave)(CA) <br />�14 <br />e <br />FOR THE CABINET AND BATTERIES TO ENGINEER. FRONT DOOR 08 <br />SHALL FACE NORTH. \ \G ` %EVUDd <br />G7-1(East River Rd)(CA) g 03 08 <br />0 120/240 V, 10, 3-WIRE, TYPE III-AF SERVICE EQUIPMENT �6 ��'��' I 03 , <br />ENCLOSURE WITH THE FOLLOWING CIRCUIT BREAKERS: R73-3(CA)/ <br />PHOTOELECTRIC 46® <br />AMPERES VOLTS POLES NAMEPLATES METER CONTROL TYPE 1+00 43+00 44+00 <br />100 240 3 MAIN BREAKER - NO YES/ � I 2' � � - <br />R73 EVUDc <br />CA) -3 __ _ (s <br />06 <br />( <br />50 120 1 TRAFFIC SIGNAL YES - �i 14' <br />15 120 1(4) FLASHING BEACON YES - McHENRY AVENUE 5J9U \ of <br />20 120 1 � SPARE YES - <br />2I2U ® 2I4U\ q \ <br />30 240 2 HIGHWAY LIGHTING NO V \ <br />15 120 1 LIGHTING CONTROL NO - 2"C, 2 10 7 212E 214E <br /># ❑[13] <br />J- -' F <br />20 120 1 � SPARE NO - \ 9 <br />01 <br />- - 3 I SPACE - - <br />4 - FOUR 1 12 <br />( ) POLE CB �7 2"C, 5 DLC, 2#10 - <br />" , � 2 C, 2 DLC, 2#10. <br />[3] 3 C, MT. THE CONTRACTOR SHALL COORDINATE WITH PG&E FOR 405' TO <br />SERVICE CONNECTION. 450' PTO _LIMIT LINE 11 <br />F4 2"C, 3#2 (SERVICE). LIMIT"LINE <br />[-5] COORDINATE WITH PG&E TO REMOVE LUMINAIRE AND OVERHEAD STEADY DEMAND SEQUENCE <br />WIRES FROM EXISTING WOOD POLE. <br />© 3"C, 2#6 (CONTROLLER), 2#8 (LIGHTING), 8#10 (FB). '� �6 b7 <br />04 - <br />77 INSTALL TYPE 1 CONDUIT INSIDE THE BARRIER. rol G7 1(McHenry Ave)(CA) <br />INSTALL PREFORMED INDUCTIVE DETECTOR LOOPS. 06 <br />4�7 � � R73-3(CA) <br />0F8 <br />INSTALL 1-A SIGNAL_ POLE ON BARRIER. SEE STRUCTURE PLAN �5 q,1 . OR OR 04 08 <br />FOR FOUNDATION DETAIL. 02 4*\ y <br />10 INSTALL TRAFFIC SIGNAL POLE ON BRIDGE STRUCTURE. SEE 05 03 1 A <br />BRIDGE STRUCTURE PLAN FOR FOUNDATION DETAIL. 08 <br />s <br />11 INSTALL No. 2 PULL BOX PER PG&E REQUIREMENT. COORDINATE 02 03 <br />WITH PG&E FOR SERVICE CONNECTION. <br />F12] INSTALL TYPE 15-FBS POLE ON BARRIER. SEE STRUCTURE PLAN PROPOSED PHASE DIAGRAM SEE SHEETS E-1 AND <br />FOR FOUNDATION DETAIL. EVUDa = 02 + 05 E-1 r1 FOR LOOP AND <br />13 INSTALL PULL BOX EVERY 200'. EVUDb = 04 + 07 LIMIT LINE DETAILS. <br />EVUDc = 01 + 06 <br />14 INSTALL SIGNAL POLE WITHOUT LMA. CUT SIGNAL POLE TO 17' 1 EVUDd = 03 + 08 <br />HEIGHT. INSTALL RE:MOVEABLE RAIN TIGHT CAP. <br />SURVEY REVISION DESCRIPTION BY DATE SCALE PREPARED BY DATE <br />DATUM: 1. MODIFY SIGNAL AND LIGHTING KC 10/15/19 1 =20 KW 10 5 16 '°� <br />HORIZONTAL: DRAWN: / / <br />Y Y&C TRANSPORTATION CONSULTANTS, INC. <br />VERTICAL: KC 10/ 5/ 16 <br />DESIGNED: & 3250 RAMOS CIRCLE <br />I I i DKY 10/5/16 C SACRAMENTO, CA 95827 <br />INCHES CHECKED: (916) 366-8000 FAX: (916) 366-8008 • • <br />c P <br />0 10 210 30 ai 50 APPROVED: ..N � <br />FILE No. : MILLIMETERS F o R <br />Y <br />� F JC <br />1 rl <br />A81 AB <br />RS <br />51 <br />AB <br />R S <br />F 5] <br />REMOVE EXISTING FLASHING BEACON SYSTEM <br />SCALE: 1 " = 50' <br />L/ _ 450' TO <br />LIMIT' LINE <br />405'^ TO <br />LIMIT' LINE <br />2"C, 5 DLC, 2#10 <br />R/W <br />6\2"C, 2 DLC, 2#10 <br />06 <br />_ - -- 2"C, 2 10 <br />G 6Jm # <br />45+`0T k� \ 6J4L 0 <br />\� \ 6J4U DH , 6J2U <br />iI <br />05 119U <br />13' - --_. <br />02 DH R73-3(CA) <br />Ar, 12' <br />EVUDa <br />G7-1(East River Rd)(CA) <br />6@ <br />A <br />R/W <br />R/W <br />Fil <br />P <br />- <br />--- -- `-' -- -PG&E SERVICE POINT_ <br />2"C, 1 DLC, �2#10 LOAD 240 V) (TO BE DETERMINED) <br />1000 W TRAFFIC SIGNAL (METERED) <br />13 ;, 51A-165 W LED Lum (UNMETERED) <br />,Cb <br />Z�\\y <br />1 DLC, �" <br />o <br />2#10 <br />c <br />--2 2#10 <br />SAN JOAQUIN COUNTY PUBLIC WORKS <br />TRANSPORTATION DIVISION <br />McHENRY AVE CORRIDOR IMPROVEMENTS <br />SIGNAL AND LIGHTING <br />AN <br />No. • <br />#\ Exp. 12/31/16 l*]1 E-2 <br />\�<���eOF <br />CV�SHEET <br />cA��F `� 93 OF176 <br />