My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-29C-131
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-131
>
2025-29C-131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 11:49:10 AM
Creation date
5/30/2025 11:48:59 AM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-131
Type - Bridge Supporting Doc
Inspection
Name
Mokelumne River (Millers Ferry) - Walnut Grove Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Monday 03/24/2025 11:55 PM 29C0131/AABH/149249Pageof12 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />13 <br />OTHER WORK RECOMMENDATIONS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS <br />SUPERSTRUCTURE WORK RECOMMENDATIONS <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Rail-Misc <br />01/14/2020 <br />Str Target ROUTINE <br />Paint the steel railings. <br />Dist Target <br />EA Status PROPOSED <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Super-Misc <br />01/13/2005 <br />Str Target ROUTINE <br />Repair the heavily damaged lower struts of the sway frames. <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Deck-Rehab <br />09/19/2007 <br />Str Target ROUTINE <br />Due to the overall condition of the deck on this structure, the County should rehabilitate deck or replace the deck. <br />Dist Target <br />EA Status PROPOSED <br />WORK RECOMMENDATIONS <br />MECHANICAL/ELECTRICAL WORK RECOMMENDATIONS <br />Work By <br />Work By <br />Work By <br />Work By <br />Work By <br />Work By <br />Work By <br />Work By <br />Work By <br />Work By <br />Action <br />Action <br />Action <br />Action <br />Action <br />Action <br />Action <br />Action <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Est Cost <br />Est Cost <br />Est Cost <br />Est Cost <br />Est Cost <br />Est Cost <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />Rec Date <br />Rec Date <br />Rec Date <br />Rec Date <br />Rec Date <br />Rec Date <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />LOCAL AGENCY <br />LOCAL AGENCY <br />LOCAL AGENCY <br />LOCAL AGENCY <br />LOCAL AGENCY <br />LOCAL AGENCY <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Mech/Elect-Replace <br />Mech/Elect-Repair/Ad <br />Mech/Elect-Rehab/Upg <br />Mech/Elect-Replace <br />Electrical-Maint <br />Mech/Elect-Repair/Ad <br />Mech/Elect-Repair/Ad <br />Mech/Elect-Rehab/Upg <br />Mech/Elect-Repair/Ad <br />Mech/Elect-Repair/Ad <br />05/09/2023 <br />05/09/2023 <br />05/09/2023 <br />05/09/2023 <br />06/02/2021 <br />06/02/2021 <br />06/02/2021 <br />05/20/2020 <br />05/20/2020 <br />05/20/2020 <br />Str Target <br />Str Target <br />Str Target <br />Str Target <br />Str Target <br />Str Target <br />Str Target <br />Str Target <br />Str Target <br />Str Target <br />PRIORITY <br />ROUTINE <br />ROUTINE <br />ROUTINE <br />ROUTINE <br />ROUTINE <br />ROUTINE <br />ROUTINE <br />ROUTINE <br />ROUTINE <br />Both North and South gates have exceeded their operational life and need be replaced with new gates with hard wired power supply. <br />Both gates have exposed wiring and degraded wiring insultaion. Both gates have faulty motor contactors. <br />All of the end wedge drive chains are too loose and need to be adjusted to take out slack. <br />All electrical panels need proper labeling and arc flash notices installed according to NEC requirements. <br />Replace all burned out navigation lamps. <br />The east end jack gearbox oil level is low. Add gear oil to the recommended fill level. <br />The top hinge was missing at the pole mounted electrical service equipment enclosure. Replace the hinge to securely lock the service <br />equipment enclosure. <br />The conduits under the bridge are rusted. Clean and paint the rusted conduits. <br />When pulling the wedges the South East wedge drive chain is rubbing against the grease lines mounted on top of the structrual <br />member. Relocate the grease lines to the side of the beam. <br />The ring gear has no grease and is showing signs of corrosion. Apply a thin layer of grease to all of the ring gear teeth. <br />Most of the drive gears are corroded. Clean off corrosion and paint the non contact surfaces of the gears with a rust inhibiting paint. <br />Dist Target <br />Dist Target <br />Dist Target <br />Dist Target <br />Dist Target <br />Dist Target <br />Dist Target <br />Dist Target <br />Dist Target <br />Dist Target <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />Status <br />Status <br />Status <br />Status <br />Status <br />Status <br />Status <br />Status <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />PROPOSED <br />PROPOSED <br />PROPOSED <br />PROPOSED <br />PROPOSED <br />PROPOSED <br />PROPOSED <br />PROPOSED
The URL can be used to link to this page
Your browser does not support the video tag.