My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
1900 - Hazardous Materials Program
>
PR0519994
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2019 11:44:18 AM
Creation date
6/9/2018 1:25:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0519994
PE
1921
FACILITY_ID
FA0003934
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
Active, billable
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
Supplemental fields
FilePath
\MIGRATIONS\C\CORRAL HOLLOW\15999\PR0519994\COMPLIANCE INFO 1998 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 1998 - 2015
QuestysRecordDate
8/30/2017 9:17:53 PM
QuestysRecordID
3364055
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
476
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LLNL Emergency Plan <br />Rev-23 <br />October 2017 <br /> <br /> 95 <br />11 TERMINATION AND RECOVERY <br />This section describes the responsibilities for Operational Emergency termination and recovery. <br />Recovery includes incident assessments and investigation, recovery planning, scheduling, repair, <br />restoration and return or relocation. At LLNL, recovery planning and management of recovery <br />activities are the responsibility of line management. <br />11.1 Emergency Termination <br />During an Operational Emergency, timely decisions are required to ensure protective actions <br />minimize the potential for health effects to onsite personnel and the public. The ED is <br />responsible for terminating the emergency phase, completing appropriate notifications and <br />entering into the recovery phase when the following general criteria are met: <br />• The emergency condition no longer exists and it appears unlikely conditions will <br />deteriorate sufficiently to cause another emergency; <br />• Implemented personnel protective measures, both onsite and offsite, are relaxed or <br />restricted to controlled areas; <br />• Evacuated areas may be re-entered though some clean-up and repair may be ongoing or <br />required, or the areas will be isolated/controlled; <br />• The IC recommends that the ED consider termination; <br />• The Emergency Management Team concurs if the EOC is activated and operational; <br />• Affected offsite response organizations concur; and <br />• If required, a Recovery Manager is appointed and a Recovery Plan Outline is developed. <br />Under DOE Order 151.1D, LLNL must notify LFO, DOE Headquarters Watch Office, State, and <br />local organizations within 30 minutes of termination of an Operational Emergency. <br />11.2 Recovery Operations <br />The purpose of the recovery effort is to return the affected facilities and areas to normal <br />operations following the termination of emergency response. Normally, the Fire Department IC <br />will formally transfer control of the incident scene (facility and local affected area) to the ES&H <br />Team Leader upon stabilization of the scene and completion of Fire Department activities. <br />However, the Security IC may elect to retain control of the incident scene as a crime scene.
The URL can be used to link to this page
Your browser does not support the video tag.