My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:57:11 PM
Creation date
8/24/2018 6:23:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516198
PE
2832
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0516198\COMPLIANCE INFO 2000 - 2016 .PDF
QuestysFileName
COMPLIANCE INFO 2000 - 2016
QuestysRecordDate
12/19/2017 10:45:19 PM
QuestysRecordID
3750331
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page-3 of-'7. <br /> t7. <br /> _ 5. SECONDARY PIPE TESTING <br /> l Oct Method Developed By: X Piping Manufacturer 0 Industry Standard C 11rotessional Engineer F� <br /> 0 Other(Spec�y) <br /> Test Method Used: X Pressure 0 Vacuum ❑Hydrostatic — 3 <br /> 0 Other(ipecijy) _ <br /> Test Egnipmont Used- Pressure Hauges in Psi/Nitrogen _ Equipment Resolution. /a"-15Psi <br /> Piping Run# 1`a Piping; Run #2� Piping hurt# 'Piping Rijn# <br /> Piping;Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: <br /> Length of Piping Run; Approx. 188' Approx.230' <br /> Product;Stared: Diesel -----� Diesel <br /> Method and location of -- 'fest boot at Transition Fest boot at Tra nsitior - <br /> nu-rein isolation: l7i in Surras_ _ _..NIP.' .Sump <br /> Wait time between applying 30 Minutes 30 Minutes <br /> es s _ daEine : <br /> _u s <br /> "hest Start Time: 2:10 � See Comments <br /> Initial Reading(RE): 3 Psi 0 Psi — <br /> 'l'est End Time: 3:10 See Comments.. . <br /> Final Reading(R.F): 3 Psi 0 Psi <br /> I "fest Duration: - I Hour See Comments -- <br /> Cliinge in Reading;(R1,110: 0 Psi See Comments <br /> Pass11 ail l'hreshold or No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: til --D .Pass X hail D 'Pass 13 Fail 11 Pass 0 Caul I <br /> CamLnt9-(include inbrmation on repairs madepri()r to tesiirr , and r ecwrutrendecl irllaw�u�ra�nr ailed testa;) _ T <br /> Piping Run#2 will not build }pressure after 1 hour of constant applied pressure. No sign of pressure at'lank <br /> l'artv end of Piping Run. <br /> '--i� c:crmmer�cl further investigation into source of loss. _- <br /> **REPAIRS & RETEST BY KAISER COMMERCIAL" <br />
The URL can be used to link to this page
Your browser does not support the video tag.