Laserfiche WebLink
SWRCB January 2002 ` <br /> _�' � <br /> 6. PIPING SUMP TESTING Page of <br /> "fest Method Developed By: ❑Sump Manufacturer C] Industry Standard X Professional Engineer <br /> ❑Other(Spec6) <br /> Test Method Used: C1 Pressure C Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> 'fest Equipment Used: Caldwell Level Change Indicator 77] Equipment Resolution: .002 <br /> Sump# 1 Sump# Sump# Sump# <br /> Sump Diameter: 45"x45"Boz <br /> Sump Depth: 49„ <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 1499 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest V y <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' Water Line 16" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes U No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA CJ Yes ❑No ❑NA <br /> roduct and water f <br /> Turbine shutdown response time Not Alarmed <br /> Is system programmed for fail-safe X Yes ❑No ❑NA []Yes ❑No [INA ❑Yes ❑No ❑NA ❑Yes tI No ❑NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑ yes X No [INA D Yes ❑No ❑NA ❑Yes ❑No ❑NA D Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying water 10 Minutes <br /> and starting test: <br /> Test Start Time: 1:50 <br /> Initial Reading(R,): .001 <br /> Test End Time: 2:20 <br /> Final Reading(RF): .001 <br /> 'Test Duration: 30 Minutes <br /> Change in Reading(R}-Ri): 0 <br /> Pass/Fail Threshold or Criteria: ,005130 Minutes <br /> Test Result: X Pass D Fail ❑ Pass ❑ Fail ❑ Puss ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properlyer testis ?ed and <br /> verified functional after tesX Yes ❑No ❑NA O Yes ❑No ❑NA ❑Yes ❑No [INA ❑Yes ❑No [INA <br /> COMMents-- (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> ' if the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRC13 LG-160) <br />