My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:57:11 PM
Creation date
8/24/2018 6:23:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516198
PE
2832
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0516198\COMPLIANCE INFO 2000 - 2016 .PDF
QuestysFileName
COMPLIANCE INFO 2000 - 2016
QuestysRecordDate
12/19/2017 10:45:19 PM
QuestysRecordID
3750331
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB January 2002 ` <br /> _�' � <br /> 6. PIPING SUMP TESTING Page of <br /> "fest Method Developed By: ❑Sump Manufacturer C] Industry Standard X Professional Engineer <br /> ❑Other(Spec6) <br /> Test Method Used: C1 Pressure C Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> 'fest Equipment Used: Caldwell Level Change Indicator 77] Equipment Resolution: .002 <br /> Sump# 1 Sump# Sump# Sump# <br /> Sump Diameter: 45"x45"Boz <br /> Sump Depth: 49„ <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 1499 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest V y <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' Water Line 16" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes U No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA CJ Yes ❑No ❑NA <br /> roduct and water f <br /> Turbine shutdown response time Not Alarmed <br /> Is system programmed for fail-safe X Yes ❑No ❑NA []Yes ❑No [INA ❑Yes ❑No ❑NA ❑Yes tI No ❑NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑ yes X No [INA D Yes ❑No ❑NA ❑Yes ❑No ❑NA D Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying water 10 Minutes <br /> and starting test: <br /> Test Start Time: 1:50 <br /> Initial Reading(R,): .001 <br /> Test End Time: 2:20 <br /> Final Reading(RF): .001 <br /> 'Test Duration: 30 Minutes <br /> Change in Reading(R}-Ri): 0 <br /> Pass/Fail Threshold or Criteria: ,005130 Minutes <br /> Test Result: X Pass D Fail ❑ Pass ❑ Fail ❑ Puss ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properlyer testis ?ed and <br /> verified functional after tesX Yes ❑No ❑NA O Yes ❑No ❑NA ❑Yes ❑No [INA ❑Yes ❑No [INA <br /> COMMents-- (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> ' if the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRC13 LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.