Laserfiche WebLink
� <br /> SWRCB,January 2002 Page 5 of <br /> 7. UNDER-DISPENSER CONTAINMENT (IJDU TESTING <br /> ffEquipment <br /> By: ❑UDC Manufacturer ❑ industry Standard ❑Professional Engineer <br /> Q Other(Spec) <br /> Q Pressure 'l Vacuum ❑Hydrostatic <br /> Q Other(.Spee) <br /> Equipment Resolution: <br /> _ UDC# UDC# UDC# UDC# <br /> UR Manufacturer: <br /> UDC Material: <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from.UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testin <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both 11 Yes ❑No ❑NA O Yes ❑No [INA Cl Yes ©No ❑NA fl Yes ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown res once time <br /> Is system programmed for fail- ❑Yes l7 No ❑NA ❑Yes O No ❑NA D Yes ❑No ❑NA ❑Yes ❑Na CI NA <br /> safe shutdown?* <br /> Was fail-safe verified to be <br /> ❑Yes ❑No DNA ❑Yes ❑No DNA Q Ye ❑No NA YNo [INAoperational?* <br /> Wait time between applying <br /> water and startin test <br /> Test Start Time: <br /> Initial Reading(111): <br /> Test land Time: <br /> Final Reading(Rr): <br /> Test Duration: <br /> Change in Reading(RF-Ra): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: ❑ Pass D Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑ Fall <br /> Was sensor removed for testing? ❑ Yes Q No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and [7 Yes ❑No ❑NA ❑Yes Q No n NA ❑Yes ❑No ❑NA U Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testingand recommended follow-up for failed tests) <br /> t3DC'S not Tested with this Testing event! "`— <br /> ` If the entire depth of the UDC is not tested,specify how much was tested, if the answer to My of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />