Laserfiche WebLink
i <br /> r�U4C <br /> Page 3 of 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer Z Industry Standard ❑ Professional Engineer <br /> El Other(Specify) <br /> Test Method Used: ©Pressure ❑Vacuum ❑ Hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> Piping Run # 1 Piping Run # 2 Piping Run # 3 Piping Run # 4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 4" 4" 6" 6" <br /> Length of Piping Run: 100' 90' 190' 160' <br /> Product Stored: Regular Premium Diesel Diesel <br /> Method and location of piping- Sump to UDC Sump to UDC Tank to Tank to Transition <br /> run isolation: Transition <br /> Wait time between applying <br /> pressurelvacuumlwaterand 5 minutes 5 minutes 5 minutes 5 minutes <br /> starting test: <br /> Test Start Time: 10:30 AM 3:00 PM ----- ------- <br /> Initial Reading (Ri): 5 psi 5 psi ------ <br /> Test End Time: 11:30 AM 4:00 PM ------ ------ <br /> Final Reading(RF): 5 psi 5 psi ----- <br /> Test Duration: 1 hour 1 hour ------ <br /> Change in Reading(RF-Ri): 0 0 ----- ------ <br /> Pass/Fail Threshold or Criteria: 0 0 ------ ------ <br /> Test Result; 91 Pass El Fail [93Pass L] Fail L3Pass El fall E3Pass m Fail <br /> Comments—finclude infonnation on repairs made pdor to testing,and recommended follow-up for failed festa <br /> Cannot get PR#3 or PR# 4 to hold pressure. Test boots in sump 3 have holes in them. 6" over 4" <br />