My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:57:11 PM
Creation date
8/24/2018 6:23:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516198
PE
2832
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0516198\COMPLIANCE INFO 2000 - 2016 .PDF
QuestysFileName
COMPLIANCE INFO 2000 - 2016
QuestysRecordDate
12/19/2017 10:45:19 PM
QuestysRecordID
3750331
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> r�U4C <br /> Page 3 of 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer Z Industry Standard ❑ Professional Engineer <br /> El Other(Specify) <br /> Test Method Used: ©Pressure ❑Vacuum ❑ Hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> Piping Run # 1 Piping Run # 2 Piping Run # 3 Piping Run # 4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 4" 4" 6" 6" <br /> Length of Piping Run: 100' 90' 190' 160' <br /> Product Stored: Regular Premium Diesel Diesel <br /> Method and location of piping- Sump to UDC Sump to UDC Tank to Tank to Transition <br /> run isolation: Transition <br /> Wait time between applying <br /> pressurelvacuumlwaterand 5 minutes 5 minutes 5 minutes 5 minutes <br /> starting test: <br /> Test Start Time: 10:30 AM 3:00 PM ----- ------- <br /> Initial Reading (Ri): 5 psi 5 psi ------ <br /> Test End Time: 11:30 AM 4:00 PM ------ ------ <br /> Final Reading(RF): 5 psi 5 psi ----- <br /> Test Duration: 1 hour 1 hour ------ <br /> Change in Reading(RF-Ri): 0 0 ----- ------ <br /> Pass/Fail Threshold or Criteria: 0 0 ------ ------ <br /> Test Result; 91 Pass El Fail [93Pass L] Fail L3Pass El fall E3Pass m Fail <br /> Comments—finclude infonnation on repairs made pdor to testing,and recommended follow-up for failed festa <br /> Cannot get PR#3 or PR# 4 to hold pressure. Test boots in sump 3 have holes in them. 6" over 4" <br />
The URL can be used to link to this page
Your browser does not support the video tag.