Laserfiche WebLink
Page 5 of 8 0 ro <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ❑UDC Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑ Pressure ❑Vacuum El Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: 1 hour LAKE Test: Equipment Resolution: <br /> UDC # 1-2 UDC # 3-4 UDC # 5-6 UDC # 6S-7S <br /> UDC Manufacturer: Unknown Unknown Unknown Unknown <br /> UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> UDC Depth: 42" 42" 42" 42" <br /> Height from UDC Bottom to Top of 9 '/2" 9 1/2" 9 '/z" 9 Y2 <br /> Highest Piping Penetration: <br /> Height from UDC Bottom to Lowest 12" 12" 12" 12" <br /> Electrical Penetration: <br /> Condition of UDC prior to testing: D D Dr D <br /> Portion of UDC Tested' 2"Above Product 2"Above Product 2"Above Product 2"Above Product <br /> Does turbine shut down when UDC <br /> sensor detects liquid(both product ® Yes ❑ No 0 NA ❑ Yes El No 0 NA 0 Yes L3 No NA E3 Yes ❑ No ® NA <br /> and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑ Yes 13 No ❑x NA ❑ Yes ❑ No EI NA ❑Yes L1 No I]NA ❑ Yes ❑ No 191 NA <br /> shutdown?' <br /> Was fail-safe verified to be ❑ Yes ❑ No I@ NA ❑Yes ❑ No Z NA ❑ Yes ❑ No 0 NA ❑ Yes ❑ No 19 NA <br /> operational?' <br /> Wait time between applying 5 minutes 5 minutes 5 minutes 5 minutes <br /> pressurefvacuumlwater and starting <br /> test <br /> Test Start Time: 2:50 PM 2:50 PM 2:50 PM 2:50 PM <br /> Initial Reading(Ri): 13" 13 3/8" 13 10/16" 13 1/4" <br /> Test End Time: 3:50 PM 3:50 PM 3:50 PM 3:50 PM <br /> Final Reading(RF): 13" 13 3/8" 13 10/16" 13 '/4" <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 0 0 <br /> Test Result: [M Pass ❑ Fail 0 Pass ❑ Fail [H] Pass ❑ Fail ® Pass ❑ Fail <br /> Was sensor removed far testin ? 0 Yes ❑ No ❑ NA 21 Yes ❑ No ❑ NA D Yes ❑ No ❑ NA ®Yes C] No ❑ NA <br /> Was sensor properly replaced after IM Yes ❑ No ❑ NA 0 Yes ❑ No ❑ NA 0 Yes ❑ No ❑ NA 19 Yes ❑ No ❑ NA <br /> testing? <br /> Comments— include information on repairs made prior to testing, and recommended follow-up for farted tests <br /> Turbine Shut Down done during Annual Monitor Certification. <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. if the answer to py of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRC13 LG-160) <br />