My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30131
>
2800 - Aboveground Petroleum Storage Program
>
PR0515796
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2019 9:08:45 AM
Creation date
8/24/2018 6:45:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515796
PE
2832
FACILITY_ID
FA0003922
STREET_NUMBER
30131
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
Dr
City
Tracy
Zip
95377
APN
25313011
CURRENT_STATUS
01
SITE_LOCATION
30131 S MacArthur Dr
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\30131\PR0515796\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
9/14/2016 6:40:54 PM
QuestysRecordID
3192744
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O 1` Q U I `IA,II, Environmental Health Department <br /> COUNTY <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> CEMEX Construction Materials Pacific, LLC 30131 S MacArthur Dr,Tracy November 01, 2018 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 601 CFR 112.7 Failure of Plan to fulfill basic requirements including a cross-referencing section. <br /> The page in the SPCC plan addressing the full approval of management was not signed or dated.This was <br /> corrected onsite. If you are the owner or operator of a facility subject to this part you must prepare a Plan in <br /> accordance with good engineering practices. The Plan must have the full approval of management at a level of <br /> authority to commit the necessary resources to fully implement the Plan.You must prepare the Plan in writing. If you <br /> do not follow the sequence specified in this section for the Plan, you must prepare an equivalent Plan acceptable to <br /> the Regional Administrator that meets all of the applicable requirements listed in this part, and you must supplement <br /> it with a section cross-referencing the location of requirements listed in this part and the equivalent requirements in <br /> the other prevention plan. If the Plan calls for additional facilities or procedures, methods, or equipment not yet fully <br /> operational, you must discuss these items in separate paragraphs, and must explain separately the details of <br /> installation and operational start-up. <br /> This was corrected on site. <br /> This is a minor violation. <br /> 609 CFR 112.7(a)(3vi), 112.7(a4)Plan failed to adequately contain procedures for reporting a discharge. <br /> The Spill Prevention, Control, and Countermeasure(SPCC)Plan does not provide information and procedures to <br /> enable a person to adequately report a discharge. The name and number of the appropriate local agency is not <br /> found in the Plan.The San Joaquin County Environmental Health Department and its phone number must be in the <br /> SPCC plan, along with any cleanup contractors with whom you have an agreement for response. If a response plan <br /> was not submitted to the Regional Administrator, this information must be included in the SPCC Plan. You must <br /> address in your plan a contact list and phone numbers for the facility response coordinator, National Response <br /> Center, cleanup contractors with whom you have an agreement for response, and all appropriate Federal, State, <br /> and local agencies who must be contacted in case of a discharge. Immediately amend the SPCC Plan to include <br /> this information and submit a copy of the revision to the EHD. <br /> This is a minor violation. <br /> FA0003922 PR0515796 SCO01 11/01/2018 <br /> EHD 28-01 Rev.09/27/2018 Page 5 of 7 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.