My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARMY
>
1624
>
2300 - Underground Storage Tank Program
>
PR0231014
>
COMPLIANCE INFO 1988 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 2:21:43 PM
Creation date
9/20/2018 11:31:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 1988 - 2006
FileName_PostFix
1988 - 2006
RECORD_ID
PR0231014
PE
2361
FACILITY_ID
FA0003777
FACILITY_NAME
TOYS R US
STREET_NUMBER
1624
STREET_NAME
ARMY
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
16334002
CURRENT_STATUS
01
SITE_LOCATION
1624 ARMY CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PIPING SUMP CONTAINMENT TESTING <br />__ <br />Test Method By: 0 Manufacturer .. 0 Industry Standard 0 Professional Engr. i Other (see below) <br />_ <br />Test Method Uses: 0 Pressure o vacuum • Hydrostatic 0 Other (see below) <br />Measuring Equipment Used: Level Change Indicator (Caldwell System 2001 / Walton Engineering) <br />Description <br />Tank #1 <br />Sump Material <br />FRP <br />Sump Diameter (inches) <br />24" <br />Sump Depth (inches) <br />24' <br />Product Stored <br />Diesel <br />Height from tank top to highest <br />piping penetration <br />9" <br />Height from tank top to lowest <br />electrical penetration <br />10" <br />Condition of sump prior to testing <br />Dry <br />Portion of sump tested <br />Entire <br />Is system programed for fail-safe operation? <br />No <br />Was fail-safe verified to be operational? <br />No <br />Was sensor removed for testing? <br />Yes <br />Was sensor properly replaced after testing? <br />Yes <br />Wait time for water level to stabilize (hr:min) <br />0:10 <br />Depth of water level from tank top (inches) <br />13" <br />Test start time <br />1:10 PM <br />Test end time <br />1:40 PM <br />Test duration (hr:min) <br />0:30 <br />Change in water level (t 0.000 inches) <br />0.000 <br />Pass/Fail threshold (0.005 inches / % Hr.) <br />0.005 <br />TEST RESULT PASS <br />Comments: <br />Unable to isolate the secondary line from the sump. The sump was tested together with that <br />portion of the secondary line existing below the water level of the sump test. The sump passed <br />this modified test. See the secondary line testing report. <br />O 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.