My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
640
>
2900 - Site Mitigation Program
>
PR0529779
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2018 11:38:00 AM
Creation date
9/26/2018 11:15:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0529779
PE
2960
FACILITY_ID
FA0019644
FACILITY_NAME
FORMER GENE GABBARD INC
STREET_NUMBER
640
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906004
CURRENT_STATUS
01
SITE_LOCATION
640 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chronology • • Page 3 <br /> 640 N. EI Dorado Street, Stockton <br /> 01/23/03 Date of Work Plan approval/directive letter from EHD. The Work Plan still did not <br /> propose vertical assessment; pumping test has not been competed; free product <br /> has not been removed. The EHD letter outlined specific tasks to be completed in <br /> the scope of work. <br /> 05/06/03- Site investigation continued with the installation of Geoprobe soil borings <br /> 05/23/03 and three additional groundwater monitoring wells during these dates. <br /> 05/30/03 Passive skimmer to remove free product was installed in MW-3 on this date. <br /> 03/04/04 Date of the EHD correspondence notifying the RP that they were out of <br /> compliance for failing to submit a Report of Findings that documents the <br /> fieldwork that was conducted in May 2003. The RP was given 14 days to submit <br /> the overdue report. <br /> 03/16/04 Date of Monitoring Well Installation Report by Ground Zero. <br /> 09/29/04 Meeting held at the request of the attorney for the RP, Gabbard Inc., to discuss <br /> site status. At issue is the continued presence of free product motor oil in well <br /> MW-3, and the distribution of PCE and TCE across the site. <br /> 10/26/04 Date of EHD correspondence summarizing the meeting and responding to the <br /> 3/16/04 Report. The EHD directed submittal of a work plan to continue the <br /> investigation. Deadline for work plan submittal was 12/17/04. <br /> 11/15/04 Date correspondence received by EHD from Ground Zero stating their position <br /> that further investigation of the site is not warranted. <br /> 11/23/04 Date of EHD correspondence to the Responsible Parties stating that further work <br /> is necessary and the deadline for the work plan to be submitted is firm. <br /> 01/10/05 Date of EHD correspondence; provided a14-day deadline to submit overdue <br /> work plan. <br /> 02/09/05 Date of Work Plan for Additional Site Work submitted by Ground Zero, <br /> 02/22/05 Date of EHD correspondence approving the Work Plan. It was, however, never <br /> implemented. <br /> 04/20/05 Active belt skimmer installed this date in MW-3 to remove free product. <br /> 04/19/06 Active belt skimmer shut down due to lack of free product removal. <br /> 05/04/06 Date of CUF letter stating Fund Manager Decision that no additional costs will be <br /> reimbursed. <br /> 05/08/06- Active belt skimmer was restarted and operated part time, during the day <br /> 05/12/06 only, to check for rebound of free product in MW-3. None was observed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.