Laserfiche WebLink
Pacific Gas & Electric is going to install a dedicated gas meter, for the VR <br /> Systems unit's auxiliary fuel supply, at between $800. 00 and $ 1 , 000 . 00. I will be <br /> contracting with Valley Mechanical, Inc. in Stockton to install the gas line from the meter <br /> to the VR Systems unit, including regulators and the permit. The quoted cost of this is <br /> about $ 1 , 600 . 00. I must point out that one of the unknown costs at this time is the cost <br /> of the natural gas that will supplement the vapor extraction fuel for the VR Systems unit. <br /> In approximately a year, one or two more monitoring wells and soil samplings will be <br /> required by the county to evaluate the progress. <br /> The plan to use the VR Systems unit has been authorized by the county, and the <br /> San Joaquin Unified Air Pollution Control District has issued a permit to construct. <br /> I hope this will suffice as the briefing you requested. <br /> Siniamil <br /> celY, <br /> . Crownover <br /> Vice President Mfg. & Eng. <br /> cc : Diane Hinson, Environmental Health Services <br /> Lawrence Beasley <br />